Project
PT. MRT Jakarta (Perseroda)
MRT Jakarta Phase II
Project
PT. MRT Jakarta (Perseroda)
MRT Jakarta Phase II
Rail and transit
Jakarta, DKI Jakarta, Indonesia
Bentley software used
AssetWise, iTwin.js, iTwin Design Review, iTwin Immersive Asset Service, ProjectWise 365, SYNCHRO 4D
Project summary
MRT Jakarta Phase II is an 11.8-kilometer urban railway development project to increase mobility and reduce congestion by providing safe, reliable public transportation. PT. MRT Jakarta is responsible for construction, operations, and maintenance amid a complex urban environment, challenging topography, and tight project schedule. Previously restricted by inefficient document management systems and time-consuming manual methods with information silos, PT. MRT Jakarta needed improved project information management to streamline design development and review.
PT. MRT Jakarta selected ProjectWise and the Bentley iTwin platform to streamline collaboration. The solution provided real-time access to trusted project information, enabled digital reviews that saved at least 10% in time, and reduced hardcopy paper submissions by 90%. Integrating AssetWise, they expect to minimize construction cost and schedule overruns. By handing over 3D models and as-built data to operations and maintenance, they will improve asset performance and reliability throughout the railway’s operational life.