/ 프로젝트 / 시공 / 시애틀-타코마 공항 국제선 도착 시설

수상자

조직 및 회사명

Clark Construction Group, LLC

시애틀-타코마 공항 국제선 도착 시설

Image Credit: Clark Construction Group, LLC

수상자

조직 및 회사명

Clark Construction Group, LLC

시애틀-타코마 공항 국제선 도착 시설

Image Credit: Clark Construction Group, LLC
수상 부문

시공

위치

시애틀, 워싱턴주, 미국

사용된 Bentley 소프트웨어

SYNCHRO 4D

프로젝트 개요

The SeaTac Airport International Arrivals Facility is the most complex capital development project in the history of the 69-year-old Seattle airport. The project included constructing a three-story building, an elevated sterile corridor, and the world’s longest pedestrian walkway over an active airport taxi lane. Clark Construction was responsible for the design and construction but faced several challenges, including remotely assembling a 3-million-pound, 320-foot-long center-span pedestrian bridge and then transporting it to the project location.TBy leveraging BIM and reality modeling technology with Bentley’s SYNCHRO 4D, Clark Construction linked the model with the construction schedule, developing a digital twin to fully visualize the construction sequencing. They used the application to enable precise planning and execution to safely install and fit the iconic walkway within three-eighths of an inch without causing airport disruptions. The digital twin will be used by the Port of Seattle for facilities management purposes.

20% 할인 벤틀리 소프트웨어

금요일에 할인 종료

쿠폰 코드 "THANKS24" 사용

인프라 납품 및 성능 우수성 축하

2024 Year in Infrastructure & Going Digital Awards

인프라 분야에서 가장 권위 있는 시상식에 프로젝트를 출품하세요! 연장된 참가 마감일은 4월 29일입니다.