Página inicial / Projetos / Engenharia estrutural / Projeto da fase 2 do parque eólico offshore de Changhua da TPC

Projeto

Organization and Company name

Sinotech Engineering Consultants, Ltd.

Projeto da fase 2 do parque eólico offshore de Changhua da TPC

Image Credit: Sinotech Engineering Consultants, Ltd.

Projeto

Organization and Company name

Sinotech Engineering Consultants, Ltd.

Projeto da fase 2 do parque eólico offshore de Changhua da TPC

Image Credit: Sinotech Engineering Consultants, Ltd.
Categorias de prêmios

Engenharia estrutural

Location

Condado de Changhua, Taiwan

Bentley software used

OpenWindPower Fixed Foundation, SACS Pile Structure Design, SACS Wind Turbine Analysis Cloud Services

Resumo do Projeto

With a total power generation capacity of 300 megawatts, providing more than 1 billion units of electricity annually, the TPC Changhua Offshore Windfarm Phase 2 project will supply carbon-free electricity to approximately 270,000 households. Sinotech is designing the wind turbine generator support structures, requiring consideration of thousands of load scenarios. Faced with complicated geometry and voluminous data, they needed cloud-based, offshore structural design and analysis technology to complete the design in a timely manner.Sinotech selected SACS to perform 80,000 load simulations, generating petabytes of data. Bentley’s application provided a dynamic modeling and analysis environment to complete the simulations in one and a half months, compared to three and a half using conventional methods. The software’s automated and comprehensive computing features saved 60% in design time and approximately five petabytes of local storage space.

20% de desconto em software da Bentley

A oferta termina na sexta-feira

Use o código de cupom "THANKS24"

Comemore a excelência na gestão e no desempenho da infraestrutura

Year in Infrastructure e Going Digital Awards 2024

Indique um projeto para os prêmios de maior prestígio em infraestrutura! O prazo estendido para participar é 29 de abril.