主页 / 项目 / Surveying and monitoring / Murray 大坝状况评估

项目

Organization and Company name

HDR

Murray 大坝状况评估

图片来源:HDR

项目

Organization and Company name

HDR

Murray 大坝状况评估

图片来源:HDR
Award Category

Surveying and monitoring

地点

San Diego County, California, United States

Bentley software used

AssetWise, ContextCapture, ContextShare, iTwin, LumenRT, MicroStation, ProjectWise

Project summary

Murray Reservoir features a dam withholding 4,644 acre-feet of water, making a major dam failure catastrophic for downstream communities. The city hired HDR to develop a high-resolution photographic record of the dam’s condition. The complexity of the structure with dam heights reaching over 100 feet presented inspection challenges, requiring multiple data capture methods. HDR wanted to generate a digital twin but needed flexible, collaborative technology to integrate and process the multi-sourced data.They selected ContextCapture to process drone-captured images and terrestrial LiDAR point clouds into a 3D reality model with an accuracy of 3 millimeters. Importing the model into MicroStation and integrating artificial intelligence, they generated a digital twin to perform digital inspections, complement the work of rope access inspections, and serve as a baseline for analysis to predict future problems. Bentley’s applications reduced the need for dangerous on-site inspections and saved significant costs compared to traditional inspection processes. The digital twin will continue to enhance quality, safety, and sustainability of inspection work at the dam.

20% Off Bentley Software

Deal Ends Friday

Use Coupon Code "THANKS24"

庆祝卓越的基础设施交付和性能

The 2024 Year in Infrastructure and Going Digital Awards

Nominate a project for the most prestigious awards in infrastructure! Extended deadline to enter is April 29th.