/ 프로젝트 / 시공 / 디지털 건설을 통해 위험한 철도 건널목을 안전하게 철거

수상자

조직 및 회사명

ACCIONA

디지털 건설을 통해 위험한 철도 건널목을 안전하게 철거

Image Credit: ACCIONA

수상자

조직 및 회사명

ACCIONA

디지털 건설을 통해 위험한 철도 건널목을 안전하게 철거

Image Credit: ACCIONA
수상 부문

시공

위치

멜버른, 빅토리아주, 호주

사용된 Bentley 소프트웨어

ContextCapture, iTwin.js, LumenRT, MicroStation, OpenBridge, OpenRail, OpenRoads, ProjectWise, SYNCHRO

프로젝트 개요

As part of Melbourne’s level crossing removal initiative, an AUD 744 million project was deployed to remove 20 level crossings and construct 13 new stations along the Frankston Line. The team wanted to ensure efficient design and timely delivery of the project. However, they faced several construction planning challenges when working in congested areas among a large stakeholder group. They also needed to upgrade their digital approach to a more seamless integrated solution, as their previous strategy lacked context, connectedness, and did not visually communicate the construction sequence.By leveraging SYNCHRO 4D, Bentley’s collaborative modeling and construction simulation software, the team established a connected data environment and created a digital twin to streamline workflows and provide unparalleled insight into constructability and construction monitoring. Implementing SYNCHRO allowed the team to reduce staging time by 67% and drafting requests by approximately 88%. SYNCHRO helped deliver the project on time with minimal disruption to passengers and the public. It provided a digital asset that can now unlock new opportunities for the realization of an intelligent digital Victoria.

20% 할인 벤틀리 소프트웨어

금요일에 할인 종료

쿠폰 코드 "THANKS24" 사용

인프라 납품 및 성능 우수성 축하

2024 Year in Infrastructure & Going Digital Awards

인프라 분야에서 가장 권위 있는 시상식에 프로젝트를 출품하세요! 연장된 참가 마감일은 4월 29일입니다.