Página inicial / Projetos / Água e águas residuais / Modeling and optimization of the Medellín Aqueduct primary network

Projeto

Organization and Company name

Empresas Públicas de Medellín EPM

Modeling and optimization of the Medellín Aqueduct primary network

Image Credit: Empresas Públicas de Medellín EPM
Um círculo preto com um "B" branco acima das palavras "Finalist 2025", fazendo referência ao YII 2025, em um fundo branco com uma barra laranja na parte superior.
A badge with an orange top border displays the text "Finalist YII 2025" on a white background, highlighting recognition for outstanding 2025 projects.

Projeto

Organization and Company name

Empresas Públicas de Medellín EPM

Modeling and optimization of the Medellín Aqueduct primary network

Image Credit: Empresas Públicas de Medellín EPM
Categorias de prêmios

Água e águas residuais

Location

Medellín, Antioquia, Colombia

Bentley software used

OpenFlows

Resumo do Projeto

Aiming to improve water supply to 1.4 million families in Medellín’s metropolitan area, public services company EPM was tasked with modeling the city’s primary aqueduct network to digitally evaluate the system and view potential solutions for guaranteeing water access for the next 30 years. Faced with developing a model comprised of five water treatment plants located in mountainous terrain, EPM’s initial fragmented approach lacked integrated simulation and scenario assessment features, limiting predictive capabilities and cost analysis. To address these issues, EPM needed comprehensive hydraulic modeling and simulation technology.

Leveraging OpenFlows to model the network, EPM performed predictive analysis, calculated pumping costs, and simulated hierarchal scenarios. Compared to one month of previous manual analysis work, the integrated hydraulic model facilitated a detailed network evaluation in just a few hours. The digital twin enables EPM to identify smart solutions that optimize network operations. Working in Bentley’s digitally simulated environment has already saved 117 tons of annual carbon emissions and nearly USD 18.6 million in total costs.

20% de desconto em software da Bentley

A oferta termina na sexta-feira

Use o código de cupom "THANKS24"

Comemore a excelência na gestão e no desempenho da infraestrutura

Year in Infrastructure e Going Digital Awards 2024

Indique um projeto para os prêmios de maior prestígio em infraestrutura! O prazo estendido para participar é 29 de abril.