Página inicial / Projetos / Construção civil / Requalificação do 20 Mass Ave NW pela RMR

Projeto

Organization and Company name

DPR CONSTRUCTION

Requalificação do 20 Mass Ave NW pela RMR

Crédito da imagem: DPR CONSTRUCTION

Projeto

Organization and Company name

DPR CONSTRUCTION

Requalificação do 20 Mass Ave NW pela RMR

Crédito da imagem: DPR CONSTRUCTION
Categorias de prêmios

Construção civil

Location

Washington, D.C., Estados Unidos

Bentley software used

SYNCHRO

Resumo do Projeto

This complex project required the transformation of an outdated office building into an experiential urban destination on Massachusetts Avenue in Washington, D.C. The project scope included extending the 300,000 square-foot original 20 Mass building both vertically and horizontally—increasing its total size to 523,000 square feet. DPR Construction engaged in extensive collaborative design and preconstruction planning, determining that prefabrication would enable the project to stay on schedule and minimize disruption to the local community. However, they faced challenges installing the prefabricated modules without impacting other works or the project timeline.They selected SYNCHRO 4D and SYNCHRO Control to link the construction schedule to 3D models, enabling the team to visualize and communicate the plan in a digitally immersive environment. SYNCHRO ensured the prefabricated works could be delivered and installed without any obstacles, while aligning to the overall construction schedule. Working in a collaborative, visual 4D environment reduced the construction schedule by two months. By reappropriating the existing 20 Mass structure, they were able to eliminate 6,905 metric tons of CO2 emissions.

20% de desconto em software da Bentley

A oferta termina na sexta-feira

Use o código de cupom "THANKS24"

Comemore a excelência na gestão e no desempenho da infraestrutura

Year in Infrastructure e Going Digital Awards 2024

Indique um projeto para os prêmios de maior prestígio em infraestrutura! O prazo estendido para participar é 29 de abril.