Startseite / Projekte / Founders' Honors / Stabilisierung eines Freileitungsmasts von Evergy

Projekt

Name der Organisation und des Unternehmens

Exo Inc.

Stabilisierung eines Freileitungsmasts von Evergy

Bildnachweis: Exo Inc.

Projekt

Name der Organisation und des Unternehmens

Exo Inc.

Stabilisierung eines Freileitungsmasts von Evergy

Bildnachweis: Exo Inc.
Auszeichnungskategorie

Übertragung und Verteilung

Standort

Clinton, Missouri, Vereinigte Staaten

Eingesetzte Bentley-Software

iTwin Capture, Power Line Systems

Projektübersicht

During a regular inspection, the team learned that a critical 161kV overhead transmission tower had been damaged during a recent flood. This particular line was serving power to several area hospitals that were at full capacity during the pandemic. Loss of power would have been catastrophic to the area. Exo was tasked with conducting a survey of the tower to assess its condition. However, the line needed to remain energized, requiring the team to find a safe but still efficient workflow.Exo selected Bentely’s iTwin Capture to accurately survey the deflected shape of the structure. Meanwhile, Power Line Systems was used to efficiently model the power lines and latticed steel support structures as a system. The applications allowed Exo to create a digital twin and design a stabilization solution so that the line could remain in service. By using Bentley applications, the team saved four to six weeks in surveying time. Exo saved lives by stabilizing the structure to avoid a potential long power outage during the pandemic.

20 % Rabatt auf Bentley-Software

Angebot endet am Freitag

Verwenden Sie den Gutscheincode „THANKS24“

Feiern Sie mit uns die Umsetzung von Infrastruktur und herausragende Leistungen

Year in Infrastructure und Going Digital Awards 2024

Reichen Sie ein Projekt ein für die renommiertesten Auszeichnungen im Infrastrukturbereich! Die verlängerte Einreichungsfrist endet am 29. April.