Accueil / Projets / Réalisation de projet / Mississippi River bridge at Lansing

Projet

Nom de l'organisation et de l'entreprise

FOTH INFRASTRUCTURE & ENVIRONMENT, LLC

Mississippi River bridge at Lansing

Image Credit: Foth Infrastructure & Environment, LLC
Un cercle noir avec un « B » blanc au-dessus des mots « Finalist 2025 », faisant référence aux YII 2025, sur un fond blanc avec une barre orange en haut.
A badge with an orange top border displays the text "Finalist YII 2025" on a white background, highlighting recognition for outstanding 2025 projects.

Projet

Nom de l'organisation et de l'entreprise

FOTH INFRASTRUCTURE & ENVIRONMENT, LLC

Mississippi River bridge at Lansing

Image Credit: Foth Infrastructure & Environment, LLC
Catégorie de prix

Réalisation de projet

Lieu

Lansing, Iowa, USA

Logiciel Bentley utilisé

Bentley Descartes, Bentley LumenRT, MicroStation, OpenBridge, OpenRoads, ProjectWise, ProStructures, Other (Infrastructure Cloud, ProjectWise 365)

Résumé du projet

Connecting Northeast Iowa and Southwest Wisconsin, the nearly 100-year-old Black Hawk Bridge in Lansing is being reconstructed to adequately accommodate 21st century traffic flow. Maintaining its aesthetic structural steel truss while modernizing the bridge capacity and safety, the new 1,724-foot structure represents the only Mississippi River crossing within 30 miles. Foth is delivering the project as the first comprehensive digital bridge design for the State of Iowa. To meet their digital deliverables, they needed a comprehensive, integrated technology solution.

Leveraging Bentley Open applications and the Bentley iTwin platform, Foth established a 3D model and single source of truth that could be used from initial conceptual design throughout construction and lifecycle management. Working in a connected, cloud-based environment with the digital model streamlined design, estimated to reduce the project schedule by 1.5 months and save USD 3.2 million in total costs. The model will facilitate future maintenance, team safety, and overall sustainability.

20 % de réduction sur les logiciels Bentley

L'OFFRE PREND FIN VENDREDI

Utilisez le code « THANKS24 »

Célébrez l'excellence en matière d'infrastructure et de performance

Year in Infrastructure 2024 et Going Digital Awards

Présentez un projet pour les prix les plus prestigieux en matière d'infrastructure ! La nouvelle date limite d'inscription est le 29 avril.