Survey and design of China’s first pumped-storage power station in a complex karst area – Caiziba pumped-storage power station in Fengjie, Chongqing

Image Credit: Shanghai Investigation, Design & Research Institute Co., Ltd.
Un cercle noir avec un « B » blanc au-dessus des mots « Finalist 2025 », faisant référence aux YII 2025, sur un fond blanc avec une barre orange en haut.
A badge with an orange top border displays the text "Finalist YII 2025" on a white background, highlighting recognition for outstanding 2025 projects.

Projet

Nom de l'organisation et de l'entreprise

Shanghai Investigation, Design & Research Institute Co., Ltd.

Survey and design of China’s first pumped-storage power station in a complex karst area – Caiziba pumped-storage power station in Fengjie, Chongqing

Image Credit: Shanghai Investigation, Design & Research Institute Co., Ltd.
Catégorie de prix

Production énergétique

Lieu

Fengjie County, Chongqing City, China

Logiciel Bentley utilisé

Bentley Descartes, Bentley LumenRT, MicroStation, OpenPlant, PLAXIS, ProjectWise, STAAD, SYNCHRO

Résumé du projet

The Caiziba pumped-storage power station is the first large-scale pumped storage project in China’s complex karst area. Located amid extensive karst formations, including caves and fissures, the project presented significant site challenges, compounded by technical and coordination issues. Previous traditional design and modeling applications resulted in data fragmentation and workflow bottlenecks. To address these shortcomings, the project team realized that they needed an integrated, dynamic technology solution.

Leveraging Bentley’s 3D modeling, digital twin, and construction simulation technology, the team established a collaborative digital platform and standardized component library, streamlining workflows and achieving dynamic coupling of geological modeling and construction. Working in a coordinated design environment eliminated 1,850 conflicts to avoid rework costs of approximately CNY 4.5 million. The integrated digital twin solution shortened the construction period by 42 days and optimized steel and concrete usage, reducing carbon emissions by 11,110 tons to deliver intelligent green infrastructure that supports regional clean energy transformation.

20 % de réduction sur les logiciels Bentley

L'OFFRE PREND FIN VENDREDI

Utilisez le code « THANKS24 »

Célébrez l'excellence en matière d'infrastructure et de performance

Year in Infrastructure 2024 et Going Digital Awards

Présentez un projet pour les prix les plus prestigieux en matière d'infrastructure ! La nouvelle date limite d'inscription est le 29 avril.