Proyecto
Nombre de la empresa y organización
China Energy Engineering Group Guangxi Electric Power Design Institute Co., Ltd.
Application of GIS+BIM digital intelligence technology to the entire lifecycle of China Southern power grid’s Guangxi Nanning 500kV power transmission and transformation project
Image Credit: China Energy Engineering Group Guangxi Electric Power Design Institute Co., Ltd.
Proyecto
Nombre de la empresa y organización
China Energy Engineering Group Guangxi Electric Power Design Institute Co., Ltd.
Application of GIS+BIM digital intelligence technology to the entire lifecycle of China Southern power grid’s Guangxi Nanning 500kV power transmission and transformation project
Image Credit: China Energy Engineering Group Guangxi Electric Power Design Institute Co., Ltd.
Categorías de premios
Transmisión y distribución
Ubicación
Nanning City, Guangxi Zhuang Autonomous Region, China
Software de Bentley que se usó
Bentley LumenRT, MicroStation, OpenRoads, OpenUtilities, ProjectWise, ProStructures, SYNCHRO, Other (OBD)
Resumen del proyecto
This 500-kilovolt power transmission station aims to optimize Nanning City’s power grid structure, improving power supply reliability and promoting clean energy. Located in a hilly area, the project presented site challenges compounded by coordinating multiple disciplines and substation equipment. To address these issues while achieving full clean energy consumption, the company sought to establish intelligent digital workflows and substation processes. When traditional technology methods proved ineffective, the company used this project as an opportunity to improve current digital design standards in China’s power sector.
Leveraging Bentley Open applications, ProjectWise, and SYNCRHO, the company established a collaborative BIM design platform and performed construction simulation. Working in a connected digital environment streamlined workflows to shorten design time by 10% and resolve 85 design collisions that reduced on-site construction changes by 91.8%. Through accurate 3D modeling, the team reduced the construction period by 5%. The 3D models provide comprehensive data and support for intelligent, digital power grid operations and maintenance.