Inicio / Proyectos / Transmisión y distribución / Application of GIS+BIM digital intelligence technology to the entire lifecycle of China Southern power grid’s Guangxi Nanning 500kV power transmission and transformation project

Proyecto

Nombre de la empresa y organización

China Energy Engineering Group Guangxi Electric Power Design Institute Co., Ltd.

Application of GIS+BIM digital intelligence technology to the entire lifecycle of China Southern power grid’s Guangxi Nanning 500kV power transmission and transformation project

Image Credit: China Energy Engineering Group Guangxi Electric Power Design Institute Co., Ltd.
Un círculo negro con una "B" blanca sobre las palabras "Finalista 2025", en referencia a YII 2025, sobre un fondo blanco con una barra naranja en la parte superior.
A badge with an orange top border displays the text "Finalist YII 2025" on a white background, highlighting recognition for outstanding 2025 projects.

Proyecto

Nombre de la empresa y organización

China Energy Engineering Group Guangxi Electric Power Design Institute Co., Ltd.

Application of GIS+BIM digital intelligence technology to the entire lifecycle of China Southern power grid’s Guangxi Nanning 500kV power transmission and transformation project

Image Credit: China Energy Engineering Group Guangxi Electric Power Design Institute Co., Ltd.
Categorías de premios

Transmisión y distribución

Ubicación

Nanning City, Guangxi Zhuang Autonomous Region, China

Software de Bentley que se usó

Bentley LumenRT, MicroStation, OpenRoads, OpenUtilities, ProjectWise, ProStructures, SYNCHRO, Other (OBD)

Resumen del proyecto

This 500-kilovolt power transmission station aims to optimize Nanning City’s power grid structure, improving power supply reliability and promoting clean energy. Located in a hilly area, the project presented site challenges compounded by coordinating multiple disciplines and substation equipment. To address these issues while achieving full clean energy consumption, the company sought to establish intelligent digital workflows and substation processes. When traditional technology methods proved ineffective, the company used this project as an opportunity to improve current digital design standards in China’s power sector.

Leveraging Bentley Open applications, ProjectWise, and SYNCRHO, the company established a collaborative BIM design platform and performed construction simulation. Working in a connected digital environment streamlined workflows to shorten design time by 10% and resolve 85 design collisions that reduced on-site construction changes by 91.8%. Through accurate 3D modeling, the team reduced the construction period by 5%. The 3D models provide comprehensive data and support for intelligent, digital power grid operations and maintenance.

20 % de descuento en software de Bentley

La oferta termina el viernes

Use el código de cupón "THANKS24"

Celebre la excelencia en la ejecución y el rendimiento de la infraestructura

El Evento Year in Infrastructure y los Premios Going Digital Awards 2024

¡Nomine un proyecto para los premios más prestigiosos en infraestructura! El plazo ampliado para participar termina el 29 de abril.