Inicio / Proyectos / Process and power generation / Proyecto de mejoramiento de la capacidad del nuevo alto horno de Yukun Iron & Steel

Proyecto

Nombre de la empresa y organización

WISDRI Engineering & Research Incorporation Limited

Proyecto de mejoramiento de la capacidad del nuevo alto horno de Yukun Iron & Steel

Crédito de la imagen: WISDRI Engineering & Research Incorporation Limited

Proyecto

Nombre de la empresa y organización

WISDRI Engineering & Research Incorporation Limited

Proyecto de mejoramiento de la capacidad del nuevo alto horno de Yukun Iron & Steel

Crédito de la imagen: WISDRI Engineering & Research Incorporation Limited
Categorías de premios

Process and power generation

Ubicación

Yuxi, Yunnan, China

Software de Bentley que se usó

AutoPIPE, iTwin Capture, OpenBuildings, OpenPlant, OpenRoads, ProjectWise, ProStructures, Raceway and Cable Management, SYNCHRO

Resumen del proyecto

As one of the largest iron and steel plants in southwest China, this blast furnace upgrade project is expected to produce 4.76 million tons of molten iron per year, while reducing annual carbon emissions by 201,100 tons. WISDRI is responsible for the plant’s design and construction, including four 1,250 cubic-meter blast furnaces and 70 subsystems. Bordering several nature preserves, the project presented environmental constraints compounded by multidiscipline, heterogeneous data collaboration and management challenges. To deliver this complex, large-scale metallurgical plant, WISDRI needed to establish collaborative BIM processes and a connected data environment.WISDRI selected ProjectWise, Bentley’s open modeling applications, and SYNCHRO to create a collaborative real-time accessible data management platform, streamline design workflows, and perform construction simulations. Compared to similar projects, the integrated digital solution reduced average design time by 16 days and shortened average on-site work time by seven days to meet the construction schedule. The automated processes and standardized data formats saved CNY 20.8 million in material costs and facilitates intelligent plant operations and maintenance, expected to reduce annual production costs by CNY 90 million.

20 % de descuento en software de Bentley

La oferta termina el viernes

Use el código de cupón "THANKS24"

Celebre la excelencia en la ejecución y el rendimiento de la infraestructura

El Evento Year in Infrastructure y los Premios Going Digital Awards 2024

¡Nomine un proyecto para los premios más prestigiosos en infraestructura! El plazo ampliado para participar termina el 29 de abril.