ホーム / プロジェクト / コンストラクション / デジタル建設を活用した危険な踏切の撤去

受賞者

組織名・会社名

ACCIONA

デジタル建設を活用した危険な踏切の撤去

Image Credit: ACCIONA

受賞者

組織名・会社名

ACCIONA

デジタル建設を活用した危険な踏切の撤去

Image Credit: ACCIONA
受賞カテゴリ

コンストラクション

場所

Melbourne, Victoria, Australia

使用されるBentleyソフトウェア

ContextCapture, iTwin.js, LumenRT, MicroStation, OpenBridge, OpenRail, OpenRoads, ProjectWise, SYNCHRO

プロジェクト概要

As part of Melbourne’s level crossing removal initiative, an AUD 744 million project was deployed to remove 20 level crossings and construct 13 new stations along the Frankston Line. The team wanted to ensure efficient design and timely delivery of the project. However, they faced several construction planning challenges when working in congested areas among a large stakeholder group. They also needed to upgrade their digital approach to a more seamless integrated solution, as their previous strategy lacked context, connectedness, and did not visually communicate the construction sequence.By leveraging SYNCHRO 4D, Bentley’s collaborative modeling and construction simulation software, the team established a connected data environment and created a digital twin to streamline workflows and provide unparalleled insight into constructability and construction monitoring. Implementing SYNCHRO allowed the team to reduce staging time by 67% and drafting requests by approximately 88%. SYNCHRO helped deliver the project on time with minimal disruption to passengers and the public. It provided a digital asset that can now unlock new opportunities for the realization of an intelligent digital Victoria.

Bentleyソフトウェアが20%オフ

セールは金曜日まで

クーポンコード「THANKS24」を使用

インフラストラクチャの提供とパフォーマンスの卓越性を称える

2024 Year in Infrastructure & Going Digital Awards

インフラ分野で最も権威のある賞にプロジェクトをノミネートしましょう! 応募期限は4月29日です。