/ 프로젝트 / 송전 및 배전 / Application of GIS+BIM digital intelligence technology to the entire lifecycle of China Southern power grid’s Guangxi Nanning 500kV power transmission and transformation project

프로젝트

조직 및 회사명

China Energy Engineering Group Guangxi Electric Power Design Institute Co., Ltd.

Application of GIS+BIM digital intelligence technology to the entire lifecycle of China Southern power grid’s Guangxi Nanning 500kV power transmission and transformation project

Image Credit: China Energy Engineering Group Guangxi Electric Power Design Institute Co., Ltd.
위쪽에 주황색 막대가 있는 흰색 배경에 "Finalist 2025"라는 문구 위에 흰색 "B"가 들어간 검은 원이 있으며, 이는 YII 2025 관련 내용을 나타냅니다.
A badge with an orange top border displays the text "Finalist YII 2025" on a white background, highlighting recognition for outstanding 2025 projects.

프로젝트

조직 및 회사명

China Energy Engineering Group Guangxi Electric Power Design Institute Co., Ltd.

Application of GIS+BIM digital intelligence technology to the entire lifecycle of China Southern power grid’s Guangxi Nanning 500kV power transmission and transformation project

Image Credit: China Energy Engineering Group Guangxi Electric Power Design Institute Co., Ltd.
수상 부문

송전 및 배전

위치

Nanning City, Guangxi Zhuang Autonomous Region, China

사용된 Bentley 소프트웨어

Bentley LumenRT, MicroStation, OpenRoads, OpenUtilities, ProjectWise, ProStructures, SYNCHRO, Other (OBD)

프로젝트 개요

This 500-kilovolt power transmission station aims to optimize Nanning City’s power grid structure, improving power supply reliability and promoting clean energy. Located in a hilly area, the project presented site challenges compounded by coordinating multiple disciplines and substation equipment. To address these issues while achieving full clean energy consumption, the company sought to establish intelligent digital workflows and substation processes. When traditional technology methods proved ineffective, the company used this project as an opportunity to improve current digital design standards in China’s power sector.

Leveraging Bentley Open applications, ProjectWise, and SYNCRHO, the company established a collaborative BIM design platform and performed construction simulation. Working in a connected digital environment streamlined workflows to shorten design time by 10% and resolve 85 design collisions that reduced on-site construction changes by 91.8%. Through accurate 3D modeling, the team reduced the construction period by 5%. The 3D models provide comprehensive data and support for intelligent, digital power grid operations and maintenance.