Página inicial / Projetos / Ferrovia e trânsito / Severn Tunnel digital transformation

Projeto

Organization and Company name

Network Rail

Severn Tunnel digital transformation

Image Credit: Network Rail
Um círculo preto com um "B" branco acima das palavras "Finalist 2025", fazendo referência ao YII 2025, em um fundo branco com uma barra laranja na parte superior.
A badge with an orange top border displays the text "Finalist YII 2025" on a white background, highlighting recognition for outstanding 2025 projects.

Projeto

Organization and Company name

Network Rail

Severn Tunnel digital transformation

Image Credit: Network Rail
Categorias de prêmios

Ferrovia e trânsito

Location

Swindon, Wiltshire, United Kingdom

Bentley software used

Bentley Descartes, iTwin Capture, iTwin Experience, MicroStation, OpenRail, Orbit, ProjectWise

Resumo do Projeto

A vital freight and passenger rail link connecting England and South Wales, the Severn Tunnel has been operating since 1886. To better preserve the 4.35-mile tunnel, ensuring reliability and safety for future generations, Network Rail wanted to generate a digital twin model of the structure. However, the lack of historical information, compounded by the sheer project size and multiple disciplines and stakeholders, presented data integration and coordination challenges. Network Rail needed integrated reality capture, 3D modeling, and digital twin technology.

Leveraging Bentley Open applications, ProjectWise, and iTwin, Network Rail generated an accurate 3D representation of the tunnel, established a connected data environment, and developed a federated model approach and digital twin accessible to the entire team and stakeholders. The collaborative digital solution reduced site visits by 50%, improving safety and reducing carbon emissions. Integrating real-time sensor data into the tunnel digital twin will facilitate future monitoring and proactive maintenance of the age-old infrastructure.

20% de desconto em software da Bentley

A oferta termina na sexta-feira

Use o código de cupom "THANKS24"

Comemore a excelência na gestão e no desempenho da infraestrutura

Year in Infrastructure e Going Digital Awards 2024

Indique um projeto para os prêmios de maior prestígio em infraestrutura! O prazo estendido para participar é 29 de abril.