Startseite / Projekte / Surveying and monitoring / New Bullards Bar Dam

Projekt

Name der Organisation und des Unternehmens

Yuba Water Agency

New Bullards Bar Dam

Image Credit: Yuba Water Agency

Projekt

Name der Organisation und des Unternehmens

Yuba Water Agency

New Bullards Bar Dam

Image Credit: Yuba Water Agency
Auszeichnungskategorie

Surveying and monitoring

Standort

Camptonville, Kalifornien, Vereinigte Staaten

Eingesetzte Bentley-Software

iTwin, iTwin Capture, iTwin IoT

Projektübersicht

Constructed in 1970, New Bullards Bar Dam was part of the Yuba River Development project to reduce flood risk, generate clean hydropower, and ensure reliable water supply for Yuba County. Yuba Water Agency initiated a modernization of the dam monitoring system, replacing a hazardous legacy system and manual inspections. The new system optimizes dam operations, preventing potential loss of life and billions of dollars of damage in Northern Sacramento Valley. Faced with steep terrain and site challenges, Yuba Water needed to remotely survey and monitor the dam.They selected iTwin Capture Modeler to generate a 3D reality mesh from thousands of drone-captured images and uploaded the mesh to the iTwin Platform, creating a digital twin. The digital twin remotely captures sensor data from monitoring devices and performs real-time digital crack detection, enabling visualization into the structural integrity of the dam. Compared to the conventional monitoring system, the automated digital station provides 1,000 times more data monitoring points and has improved data accuracy by 50% and risk assessment by 100%.

20 % Rabatt auf Bentley-Software

Angebot endet am Freitag

Verwenden Sie den Gutscheincode „THANKS24“

Feiern Sie mit uns die Umsetzung von Infrastruktur und herausragende Leistungen

Year in Infrastructure und Going Digital Awards 2024

Reichen Sie ein Projekt ein für die renommiertesten Auszeichnungen im Infrastrukturbereich! Die verlängerte Einreichungsfrist endet am 29. April.