Startseite / Projekte / Wasser und Abwasser / Numerical simulation and analysis of urban flood control and drainage capacity in Northwest China based on digital technology

Projekt

Name der Organisation und des Unternehmens

CSCEC AECOM Consultants Co., Ltd.

Numerical simulation and analysis of urban flood control and drainage capacity in Northwest China based on digital technology

Bildnachweis: CSCEC AECOM Consultants Co., Ltd.
Ein sich auf YII 2025 beziehender schwarzer Kreis mit einem weißen „B“ über den Worten „Finalist 2025“ auf weißem Hintergrund mit einem orangefarbenen Balken oben.
A badge with an orange top border displays the text "Finalist YII 2025" on a white background, highlighting recognition for outstanding 2025 projects.

Projekt

Name der Organisation und des Unternehmens

CSCEC AECOM Consultants Co., Ltd.

Numerical simulation and analysis of urban flood control and drainage capacity in Northwest China based on digital technology

Bildnachweis: CSCEC AECOM Consultants Co., Ltd.
Auszeichnungskategorie

Wasser und Abwasser

Standort

Jinchang City, Gansu Province, China

Eingesetzte Bentley-Software

Bentley LumenRT, MicroStation, OpenFlows, OpenRoads

Projektübersicht

Led by CSCEC AECOM, this project aims to diagnose urban drainage system issues through 3D modeling and digital analysis, ensuring flood resilience under extreme rainfall to protect 300,000 residents in China’s Jinchuan district. Faced with aging infrastructure, missing data, complex underground utilities, and coordinating a multidiscipline team, CSCEC’s traditional 2D design approach failed to adequately meet the project’s modeling, analysis, and collaboration requirements. They needed an integrated, comprehensive, and collaborative hydraulic technology solution.

Leveraging Bentley OpenFlows and OpenRoads with 3D reality modeling applications, CSCEC established and open, connected data environment and digital twin. Using the model to perform hydrodynamic simulations, they optimized drainage system design, reducing design errors by 90% and piping material waste by 15%. Working in a collaborative platform shortened the construction period by 40%. The digital solution reduced carbon emissions by 500 tons and eliminated flood risk of 1,146 hectares. The project establishes a replicable digital benchmark for urban flood control in Northwest China.

20 % Rabatt auf Bentley-Software

Angebot endet am Freitag

Verwenden Sie den Gutscheincode „THANKS24“

Feiern Sie mit uns die Umsetzung von Infrastruktur und herausragende Leistungen

Year in Infrastructure und Going Digital Awards 2024

Reichen Sie ein Projekt ein für die renommiertesten Auszeichnungen im Infrastrukturbereich! Die verlängerte Einreichungsfrist endet am 29. April.