Accueil / Projets / Gestion de l'eau et des eaux usées / Numerical simulation and analysis of urban flood control and drainage capacity in Northwest China based on digital technology

Projet

Nom de l'organisation et de l'entreprise

CSCEC AECOM Consultants Co., Ltd.

Numerical simulation and analysis of urban flood control and drainage capacity in Northwest China based on digital technology

Crédit image : CSCEC AECOM Consultants Co., Ltd.
Un cercle noir avec un « B » blanc au-dessus des mots « Finalist 2025 », faisant référence aux YII 2025, sur un fond blanc avec une barre orange en haut.
A badge with an orange top border displays the text "Finalist YII 2025" on a white background, highlighting recognition for outstanding 2025 projects.

Projet

Nom de l'organisation et de l'entreprise

CSCEC AECOM Consultants Co., Ltd.

Numerical simulation and analysis of urban flood control and drainage capacity in Northwest China based on digital technology

Crédit image : CSCEC AECOM Consultants Co., Ltd.
Catégorie de prix

Gestion de l'eau et des eaux usées

Lieu

Jinchang City, Gansu Province, China

Logiciel Bentley utilisé

Bentley LumenRT, MicroStation, OpenFlows, OpenRoads

Résumé du projet

Led by CSCEC AECOM, this project aims to diagnose urban drainage system issues through 3D modeling and digital analysis, ensuring flood resilience under extreme rainfall to protect 300,000 residents in China’s Jinchuan district. Faced with aging infrastructure, missing data, complex underground utilities, and coordinating a multidiscipline team, CSCEC’s traditional 2D design approach failed to adequately meet the project’s modeling, analysis, and collaboration requirements. They needed an integrated, comprehensive, and collaborative hydraulic technology solution.

Leveraging Bentley OpenFlows and OpenRoads with 3D reality modeling applications, CSCEC established and open, connected data environment and digital twin. Using the model to perform hydrodynamic simulations, they optimized drainage system design, reducing design errors by 90% and piping material waste by 15%. Working in a collaborative platform shortened the construction period by 40%. The digital solution reduced carbon emissions by 500 tons and eliminated flood risk of 1,146 hectares. The project establishes a replicable digital benchmark for urban flood control in Northwest China.

20 % de réduction sur les logiciels Bentley

L'OFFRE PREND FIN VENDREDI

Utilisez le code « THANKS24 »

Célébrez l'excellence en matière d'infrastructure et de performance

Year in Infrastructure 2024 et Going Digital Awards

Présentez un projet pour les prix les plus prestigieux en matière d'infrastructure ! La nouvelle date limite d'inscription est le 29 avril.