主页 / 项目 / 施工 / 西雅图-塔科马机场国际到达大厅设施

获奖者

Organization and Company name

Clark Construction Group, LLC

西雅图-塔科马机场国际到达大厅设施

Image Credit: Clark Construction Group, LLC

获奖者

Organization and Company name

Clark Construction Group, LLC

西雅图-塔科马机场国际到达大厅设施

Image Credit: Clark Construction Group, LLC
Award Category

施工

地点

美国,华盛顿州,西雅图市

Bentley software used

SYNCHRO 4D

Project summary

The SeaTac Airport International Arrivals Facility is the most complex capital development project in the history of the 69-year-old Seattle airport. The project included constructing a three-story building, an elevated sterile corridor, and the world’s longest pedestrian walkway over an active airport taxi lane. Clark Construction was responsible for the design and construction but faced several challenges, including remotely assembling a 3-million-pound, 320-foot-long center-span pedestrian bridge and then transporting it to the project location.TBy leveraging BIM and reality modeling technology with Bentley’s SYNCHRO 4D, Clark Construction linked the model with the construction schedule, developing a digital twin to fully visualize the construction sequencing. They used the application to enable precise planning and execution to safely install and fit the iconic walkway within three-eighths of an inch without causing airport disruptions. The digital twin will be used by the Port of Seattle for facilities management purposes.

20% Off Bentley Software

Deal Ends Friday

Use Coupon Code "THANKS24"

庆祝卓越的基础设施交付和性能

The 2024 Year in Infrastructure and Going Digital Awards

Nominate a project for the most prestigious awards in infrastructure! Extended deadline to enter is April 29th.