Inicio / Proyectos / Process and power generation / Application Of BIM Technology In The Lifecycle Of Wuqiangxi Hydroelectric Power Station Expansion Project

Project

Nombre de la empresa y organización

PowerChina ZhongNan Engineering Corporation Limited

Application Of BIM Technology In The Lifecycle Of Wuqiangxi Hydroelectric Power Station Expansion Project

Crédito de la imagen: PowerChina ZhongNan Engineering Corporation Limited

Project

Nombre de la empresa y organización

PowerChina ZhongNan Engineering Corporation Limited

Application Of BIM Technology In The Lifecycle Of Wuqiangxi Hydroelectric Power Station Expansion Project

Crédito de la imagen: PowerChina ZhongNan Engineering Corporation Limited
Award Category

Process and power generation

Location

Changsha, Hunan, China

Software de Bentley que se usó

AutoPIPE, AutoPLANT, Bentley Raceway and Cable Management, ContextCapture, iTwin.js, MicroStation, OpenBuildings, OpenBuildings Designer, OpenPlant, OpenRoads Designer, ProjectWise, SYNCHRO 4D

Resumen del proyecto

To improve its hydraulic resources, the owner-operator of Wuqiangxi Hydropower Station will add 500 megawatts of installed capacity to its existing 1,200-megawatt capacity. The project presents complicated construction conditions, large engineering quantities, and a complex pipeline, compounded by the challenge of coordinating a multidiscipline team on a tight schedule. PowerChina ZhongNan provided engineering survey, design, and digital construction services. They realized that traditional manual design strategies were insufficient and needed integrated 3D BIM methodologies to achieve lifecycle digital plant management.PowerChina ZhongNan selected ContextCapture to generate a reality mesh. Bentley’s open 3D modeling applications, including OpenPlant, established a BIM design model and digital twin. Using ProjectWise, they seamlessly shared data and models among 13 disciplines. The applications helped decrease design time by two months while resolving over 70 design issues. The digital application provided visual management and control throughout construction, reducing costs by CNY 50 million.

20 % de descuento en software de Bentley

La oferta termina el viernes

Use el código de cupón "THANKS24"

Celebre la excelencia en la ejecución y el rendimiento de la infraestructura

El Evento Year in Infrastructure y Premios Going Digital Awards 2024

¡Nomine un proyecto para los premios más prestigiosos en infraestructura! El plazo ampliado para participar termina el 29 de abril.