Numerical simulation and analysis of urban flood control and drainage capacity in Northwest China based on digital technology

Crédito de la imagen: CSCEC AECOM Consultants Co., Ltd.
Un círculo negro con una "B" blanca sobre las palabras "Finalista 2025", en referencia a YII 2025, sobre un fondo blanco con una barra naranja en la parte superior.
A badge with an orange top border displays the text "Finalist YII 2025" on a white background, highlighting recognition for outstanding 2025 projects.

Proyecto

Nombre de la empresa y organización

CSCEC AECOM Consultants Co., Ltd.

Numerical simulation and analysis of urban flood control and drainage capacity in Northwest China based on digital technology

Crédito de la imagen: CSCEC AECOM Consultants Co., Ltd.
Categorías de premios

Agua y aguas residuales

Ubicación

Jinchang City, Gansu Province, China

Software de Bentley que se usó

Bentley LumenRT, MicroStation, OpenFlows, OpenRoads

Resumen del proyecto

Led by CSCEC AECOM, this project aims to diagnose urban drainage system issues through 3D modeling and digital analysis, ensuring flood resilience under extreme rainfall to protect 300,000 residents in China’s Jinchuan district. Faced with aging infrastructure, missing data, complex underground utilities, and coordinating a multidiscipline team, CSCEC’s traditional 2D design approach failed to adequately meet the project’s modeling, analysis, and collaboration requirements. They needed an integrated, comprehensive, and collaborative hydraulic technology solution.

Leveraging Bentley OpenFlows and OpenRoads with 3D reality modeling applications, CSCEC established and open, connected data environment and digital twin. Using the model to perform hydrodynamic simulations, they optimized drainage system design, reducing design errors by 90% and piping material waste by 15%. Working in a collaborative platform shortened the construction period by 40%. The digital solution reduced carbon emissions by 500 tons and eliminated flood risk of 1,146 hectares. The project establishes a replicable digital benchmark for urban flood control in Northwest China.

20 % de descuento en software de Bentley

La oferta termina el viernes

Use el código de cupón "THANKS24"

Celebre la excelencia en la ejecución y el rendimiento de la infraestructura

El Evento Year in Infrastructure y los Premios Going Digital Awards 2024

¡Nomine un proyecto para los premios más prestigiosos en infraestructura! El plazo ampliado para participar termina el 29 de abril.