Application de la technologie BIM dans le cycle de vie du projet d'extension de la centrale hydroélectrique de Wuqiangxi

Crédit image : PowerChina ZhongNan Engineering Corporation Limited

Project

Nom de l'organisation et de l'entreprise

PowerChina ZhongNan Engineering Corporation Limited

Application de la technologie BIM dans le cycle de vie du projet d'extension de la centrale hydroélectrique de Wuqiangxi

Crédit image : PowerChina ZhongNan Engineering Corporation Limited
Catégorie de prix

Process and power generation

Lieu

Changsha, Hunan, Chine

Logiciel Bentley utilisé

AutoPIPE, AutoPLANT, Bentley Raceway and Cable Management, ContextCapture, iTwin.js, MicroStation, OpenBuildings, OpenBuildings Designer, OpenPlant, OpenRoads Designer, ProjectWise, SYNCHRO 4D

Résumé du projet

To improve its hydraulic resources, the owner-operator of Wuqiangxi Hydropower Station will add 500 megawatts of installed capacity to its existing 1,200-megawatt capacity. The project presents complicated construction conditions, large engineering quantities, and a complex pipeline, compounded by the challenge of coordinating a multidiscipline team on a tight schedule. PowerChina ZhongNan provided engineering survey, design, and digital construction services. They realized that traditional manual design strategies were insufficient and needed integrated 3D BIM methodologies to achieve lifecycle digital plant management.PowerChina ZhongNan selected ContextCapture to generate a reality mesh. Bentley’s open 3D modeling applications, including OpenPlant, established a BIM design model and digital twin. Using ProjectWise, they seamlessly shared data and models among 13 disciplines. The applications helped decrease design time by two months while resolving over 70 design issues. The digital application provided visual management and control throughout construction, reducing costs by CNY 50 million.

20 % de réduction sur les logiciels Bentley

L'OFFRE PREND FIN VENDREDI

Utilisez le code « THANKS24 »

Célébrez l'excellence en matière d'infrastructure et de performance

Year in Infrastructure 2024 et Going Digital Awards

Présentez un projet pour les prix les plus prestigieux en matière d'infrastructure ! La nouvelle date limite d'inscription est le 29 avril.