Accueil / Projets / Process and power generation / Phase II du projet de jumeaux numériques de l'usine C5, Neusoft Healthcare International Industrial Park

Project

Nom de l'organisation et de l'entreprise

Shenyang Aluminum & Magnesium Engineering & Research Institute Co., Ltd.

Phase II du projet de jumeaux numériques de l'usine C5, Neusoft Healthcare International Industrial Park

Image Credit: Shenyang Aluminum & Magnesium Engineering & Research Institute Co., Ltd.

Project

Nom de l'organisation et de l'entreprise

Shenyang Aluminum & Magnesium Engineering & Research Institute Co., Ltd.

Phase II du projet de jumeaux numériques de l'usine C5, Neusoft Healthcare International Industrial Park

Image Credit: Shenyang Aluminum & Magnesium Engineering & Research Institute Co., Ltd.
Catégorie de prix

Process and power generation

Lieu

Shenyang, Liaoning, Chine

Logiciel Bentley utilisé

Bentley Raceway and Cable Management, MicroStation, OpenBuildings, OpenPlant, OpenRoads Designer, ProjectWise, SYNCHRO 4D

Résumé du projet

The second phase of Neusoft Healthcare International Industrial Park’s production line expansion is a large-scale civil project, featuring three factory buildings and numerous utility systems spanning over 63,000 square meters. SAMI is responsible for 3D digital design and faced a tight schedule with strict demands on design scheme and construction optimization. They realized that previous traditional methods for implementing civil projects were inadequate and that they needed integrated BIM and digital twin technology.Already familiar with ProjectWise, SAMI established a collaborative management platform to coordinate over 10 disciplines. They created over 600 3D digital models, saving approximately 2,000 hours. They created full-featured digital twins from the 3D models and used SYNCHRO 4D to link the construction schedule to the model, shortening construction by 300 hours. Bentley’s digital twin solution will save over CNY 3 million in construction costs and lay the foundation for building a digital twin factory.

20 % de réduction sur les logiciels Bentley

L'OFFRE PREND FIN VENDREDI

Utilisez le code « THANKS24 »

Célébrez l'excellence en matière d'infrastructure et de performance

Year in Infrastructure 2024 et Going Digital Awards

Présentez un projet pour les prix les plus prestigieux en matière d'infrastructure ! La nouvelle date limite d'inscription est le 29 avril.