Accueil / Projets / Rail et transit / Smart infrastructure: digital transformation of LRT Jakarta phase 1B

Projet

Nom de l'organisation et de l'entreprise

PT Waskita Karya (Persero) Tbk.

Smart infrastructure: digital transformation of LRT Jakarta phase 1B

Image Credit: PT Waskita Karya (Persero) Tbk.
Un cercle noir avec un « B » blanc au-dessus des mots « Finalist 2025 », faisant référence aux YII 2025, sur un fond blanc avec une barre orange en haut.
A badge with an orange top border displays the text "Finalist YII 2025" on a white background, highlighting recognition for outstanding 2025 projects.

Projet

Nom de l'organisation et de l'entreprise

PT Waskita Karya (Persero) Tbk.

Smart infrastructure: digital transformation of LRT Jakarta phase 1B

Image Credit: PT Waskita Karya (Persero) Tbk.
Catégorie de prix

Rail et transit

Lieu

East Jakarta, Special Capital Region Jakarta, Indonesia

Logiciel Bentley utilisé

iTwin Capture, iTwin Experience, ProjectWise, SYNCHRO

Résumé du projet

Aligned with the city’s sustainability commitment, Jakarta is developing a 46.8-kilometer light rail transit (LRT) system that will reduce their annual carbon footprint by 21 million passenger trips, decreasing reliance on vehicles and fossil fuels. Waskita Karya is the main contractor delivering LRT’s first phase, extending 6.4 kilometers through an active urban corridor, presenting site constraints and requiring coordination of multiple stakeholders, making it challenging to minimize public disruption and keep the project on schedule.

Waskita Karya leveraged Bentley ProjectWise, iTwin, and SYNCHRO to integrate reality capture, BIM, and 4D simulation. Using Bentley’s applications, they established a connected data environment and digital twin, allowing the team to visualize logistical and construction constraints and optimize planning. Working in an integrated digital ecosystem facilitated real-time data sharing and remote monitoring capabilities that improved data exchange by 80% and reduced field inspections by 20%. The digital twin solution optimized material usage and saved 7,356 liters of fuel, reducing environmental impact and saving USD 14.82 million in costs.

20 % de réduction sur les logiciels Bentley

L'OFFRE PREND FIN VENDREDI

Utilisez le code « THANKS24 »

Célébrez l'excellence en matière d'infrastructure et de performance

Year in Infrastructure 2024 et Going Digital Awards

Présentez un projet pour les prix les plus prestigieux en matière d'infrastructure ! La nouvelle date limite d'inscription est le 29 avril.