Página inicial / Projetos / Process and power generation / Application Of BIM Technology In The Lifecycle Of Wuqiangxi Hydroelectric Power Station Expansion Project

Projeto

Organization and Company name

PowerChina ZhongNan Engineering Corporation Limited

Application Of BIM Technology In The Lifecycle Of Wuqiangxi Hydroelectric Power Station Expansion Project

Crédito da imagem: PowerChina ZhongNan Engineering Corporation Limited

Projeto

Organization and Company name

PowerChina ZhongNan Engineering Corporation Limited

Application Of BIM Technology In The Lifecycle Of Wuqiangxi Hydroelectric Power Station Expansion Project

Crédito da imagem: PowerChina ZhongNan Engineering Corporation Limited
Categorias de prêmios

Process and power generation

Location

Changsha, Hunan, China

Bentley software used

AutoPIPE, AutoPLANT, Bentley Raceway and Cable Management, ContextCapture, iTwin.js, MicroStation, OpenBuildings, OpenBuildings Designer, OpenPlant, OpenRoads Designer, ProjectWise, SYNCHRO 4D

Resumo do Projeto

To improve its hydraulic resources, the owner-operator of Wuqiangxi Hydropower Station will add 500 megawatts of installed capacity to its existing 1,200-megawatt capacity. The project presents complicated construction conditions, large engineering quantities, and a complex pipeline, compounded by the challenge of coordinating a multidiscipline team on a tight schedule. PowerChina ZhongNan provided engineering survey, design, and digital construction services. They realized that traditional manual design strategies were insufficient and needed integrated 3D BIM methodologies to achieve lifecycle digital plant management.PowerChina ZhongNan selected ContextCapture to generate a reality mesh. Bentley’s open 3D modeling applications, including OpenPlant, established a BIM design model and digital twin. Using ProjectWise, they seamlessly shared data and models among 13 disciplines. The applications helped decrease design time by two months while resolving over 70 design issues. The digital application provided visual management and control throughout construction, reducing costs by CNY 50 million.

20% de desconto em software da Bentley

A oferta termina na sexta-feira

Use o código de cupom "THANKS24"

Comemore a excelência na gestão e no desempenho da infraestrutura

Year in Infrastructure e Going Digital Awards 2024

Indique um projeto para os prêmios de maior prestígio em infraestrutura! O prazo estendido para participar é 29 de abril.