Página inicial / Projetos / Surveying and monitoring / O maior mapa de saneamento 3D do Brasil (Digitalização do Rio de Janeiro)

Projeto

Organization and Company name

AEGEA

O maior mapa de saneamento 3D do Brasil (Digitalização do Rio de Janeiro)

Crédito da imagem: AEGEA

Projeto

Organization and Company name

AEGEA

O maior mapa de saneamento 3D do Brasil (Digitalização do Rio de Janeiro)

Crédito da imagem: AEGEA
Categorias de prêmios

Surveying and monitoring

Location

Rio de Janeiro, Brazil

Bentley software used

ContextCapture, iTwin, LumenRT, MicroStation, OpenBuildings, OpenCities, ProjectWise

Resumo do Projeto

The Infra Inteligente program aims to identify and verify all physical assets of Aegea’s sanitation operation by creating a digital 3D map of their structures located across 13 Brazilian states. As part of this digitalization program, Aegea implemented its largest asset inventory project in Rio de Janeiro, requiring capturing and integrating more than 29,000 physical assets, 1,317 industrial plants, and 211,000 surveys. To enable 70 specialists from multiple engineering disciplines to complete the project, Aegea needed integrated BIM and reality modeling technology.Leveraging ContextCapture and Bentley’s open modeling applications, Aegea processed a total of 156,000 drone-captured photos to generate a 3D reality mesh and digital twin. Creating a virtual reality environment provides real-time asset and plant insight to monitor equipment health and operation, enabling digital lifecycle management of sanitation assets, optimizing performance, service availability, and reliability. The 3D digital solution ensures risk mitigation and operational efficiencies and facilitates the modernization of Aegea’s sanitation network.

20% de desconto em software da Bentley

A oferta termina na sexta-feira

Use o código de cupom "THANKS24"

Comemore a excelência na gestão e no desempenho da infraestrutura

Year in Infrastructure e Going Digital Awards 2024

Indique um projeto para os prêmios de maior prestígio em infraestrutura! O prazo estendido para participar é 29 de abril.