Projeto
Organization and Company name
HDR
Avaliação da Condição da Barragem de Murray
Crédito da imagem: HDR
Projeto
Organization and Company name
HDR
Avaliação da Condição da Barragem de Murray
Crédito da imagem: HDR
Categorias de prêmios
Surveying and monitoring
Location
Condado de San Diego, Califórnia, Estados Unidos
Bentley software used
AssetWise, ContextCapture, ContextShare, iTwin, LumenRT, MicroStation, ProjectWise
Resumo do Projeto
Murray Reservoir features a dam withholding 4,644 acre-feet of water, making a major dam failure catastrophic for downstream communities. The city hired HDR to develop a high-resolution photographic record of the dam’s condition. The complexity of the structure with dam heights reaching over 100 feet presented inspection challenges, requiring multiple data capture methods. HDR wanted to generate a digital twin but needed flexible, collaborative technology to integrate and process the multi-sourced data.They selected ContextCapture to process drone-captured images and terrestrial LiDAR point clouds into a 3D reality model with an accuracy of 3 millimeters. Importing the model into MicroStation and integrating artificial intelligence, they generated a digital twin to perform digital inspections, complement the work of rope access inspections, and serve as a baseline for analysis to predict future problems. Bentley’s applications reduced the need for dangerous on-site inspections and saved significant costs compared to traditional inspection processes. The digital twin will continue to enhance quality, safety, and sustainability of inspection work at the dam.