Strona główna / Projekty / Wodociągi i kanalizacja / Numerical simulation and analysis of urban flood control and drainage capacity in Northwest China based on digital technology

Projekt

Organizacja i nazwa firmy

CSCEC AECOM Consultants Co., Ltd.

Numerical simulation and analysis of urban flood control and drainage capacity in Northwest China based on digital technology

Źródło obrazu: CSCEC AECOM Consultants Co., Ltd.
Czarne koło z białą literą „B” nad słowami „ Finalista 2025”, odnoszącymi się do YII 2025, na białym tle z pomarańczowym paskiem u góry.
A badge with an orange top border displays the text "Finalist YII 2025" on a white background, highlighting recognition for outstanding 2025 projects.

Projekt

Organizacja i nazwa firmy

CSCEC AECOM Consultants Co., Ltd.

Numerical simulation and analysis of urban flood control and drainage capacity in Northwest China based on digital technology

Źródło obrazu: CSCEC AECOM Consultants Co., Ltd.
Kategoria konkursu

Wodociągi i kanalizacja

Lokalizacja

Jinchang City, Gansu Province, China

Wykorzystane oprogramowanie Bentley

Bentley LumenRT, MicroStation, OpenFlows, OpenRoads

Podsumowanie projektu

Led by CSCEC AECOM, this project aims to diagnose urban drainage system issues through 3D modeling and digital analysis, ensuring flood resilience under extreme rainfall to protect 300,000 residents in China’s Jinchuan district. Faced with aging infrastructure, missing data, complex underground utilities, and coordinating a multidiscipline team, CSCEC’s traditional 2D design approach failed to adequately meet the project’s modeling, analysis, and collaboration requirements. They needed an integrated, comprehensive, and collaborative hydraulic technology solution.

Leveraging Bentley OpenFlows and OpenRoads with 3D reality modeling applications, CSCEC established and open, connected data environment and digital twin. Using the model to perform hydrodynamic simulations, they optimized drainage system design, reducing design errors by 90% and piping material waste by 15%. Working in a collaborative platform shortened the construction period by 40%. The digital solution reduced carbon emissions by 500 tons and eliminated flood risk of 1,146 hectares. The project establishes a replicable digital benchmark for urban flood control in Northwest China.

20% rabatu na oprogramowanie Bentley

Oferta kończy się w piątek

Użyj kodu „THANKS24”

Świętuj z nami wybitne osiągnięcia w dziedzinie realizacji i wydajności infrastruktury

Konferencja Year in Infrastructure i konkurs Going Digital Awards 2024

Zgłoś projekt do najbardziej prestiżowego konkursu w dziedzinie infrastruktury! Przedłużony termin nadsyłania zgłoszeń upływa 29 kwietnia.