Application of GIS+BIM digital intelligence technology to the entire lifecycle of China Southern power grid’s Guangxi Nanning 500kV power transmission and transformation project
Image Credit: China Energy Engineering Group Guangxi Electric Power Design Institute Co., Ltd.
Projeto
Organization and Company name
China Energy Engineering Group Guangxi Electric Power Design Institute Co., Ltd.
Application of GIS+BIM digital intelligence technology to the entire lifecycle of China Southern power grid’s Guangxi Nanning 500kV power transmission and transformation project
Image Credit: China Energy Engineering Group Guangxi Electric Power Design Institute Co., Ltd.
Categorias de prêmios
Transmissão e distribuição
Location
Nanning City, Guangxi Zhuang Autonomous Region, China
Bentley software used
Bentley LumenRT, MicroStation, OpenRoads, OpenUtilities, ProjectWise, ProStructures, SYNCHRO, Other (OBD)
Resumo do Projeto
This 500-kilovolt power transmission station aims to optimize Nanning City’s power grid structure, improving power supply reliability and promoting clean energy. Located in a hilly area, the project presented site challenges compounded by coordinating multiple disciplines and substation equipment. To address these issues while achieving full clean energy consumption, the company sought to establish intelligent digital workflows and substation processes. When traditional technology methods proved ineffective, the company used this project as an opportunity to improve current digital design standards in China’s power sector.
Leveraging Bentley Open applications, ProjectWise, and SYNCRHO, the company established a collaborative BIM design platform and performed construction simulation. Working in a connected digital environment streamlined workflows to shorten design time by 10% and resolve 85 design collisions that reduced on-site construction changes by 91.8%. Through accurate 3D modeling, the team reduced the construction period by 5%. The 3D models provide comprehensive data and support for intelligent, digital power grid operations and maintenance.