New Palermo-Catania-Messina railway connection

Image Credit: Italferr S.p.A.
A black circle with a white "B" above the words "Finalist 2025," referencing YII 2025, on a white background with an orange bar at the top.
A badge with an orange top border displays the text "Finalist YII 2025" on a white background, highlighting recognition for outstanding 2025 projects.

项目

Organization and Company name

Italferr S.p.A.

New Palermo-Catania-Messina railway connection

Image Credit: Italferr S.p.A.
Award Category

项目交付

地点

Palermo-Catania-Messina, Sicilia, Italy

Bentley software used

Bentley LumenRT, MicroStation, OpenRail, OpenRoads, ProjectWise, SYNCHRO

Project summary

To help reduce travel times, and improve the efficiency, reliability, and sustainability of freight and passenger transport in Sicily, Italferr is working as the contracting authority to upgrade 185 kilometers along the Palermo-Cantania-Messina rail connection. The multidiscipline project presented coordination and data integration challenges with managing and verifying more than 9,800 information models. Italferr needed a cloud-based technology solution to guarantee data traceability and accessibility throughout the design verification process.

Leveraging Bentley ProjectWise with iTwin and SYNCHRO, Italferr established a common web-based data platform, integrated 3D information model, and digital twin to perform 4D construction simulation and verify the design relative to the project schedule. Working in a collaborative digital environment reduced data loss associated with file and model exchange by 95%. Using Bentley’s applications saved 80% in time through real-time model updates and helped eliminate more than 4,500 design interferences during the verification phase.

20% Off Bentley Software

Deal Ends Friday

Use Coupon Code "THANKS24"

庆祝卓越的基础设施交付和性能

The 2024 Year in Infrastructure and Going Digital Awards

Nominate a project for the most prestigious awards in infrastructure! Extended deadline to enter is April 29th.