印度尼西亚新首都努桑塔拉公路和高速公路连通性

图片来源:PT Wijaya Karya

项目

Organization and Company name

PT Wijaya Karya

印度尼西亚新首都努桑塔拉公路和高速公路连通性

图片来源:PT Wijaya Karya
Award Category

公路和高速公路

地点

印度尼西亚,东加里曼丹省,巴厘巴板市

Bentley software used

Bentley LumenRT, iTwin, iTwin Capture, MicroStation, OpenBridge, OpenRoads, OpenTunnel, PLAXIS, ProjectWise, SYNCHRO

Project summary

As part of moving Indonesia’s capital city to Nusantara, PT Wijaya Karya (WIKA) was tasked with constructing 57 kilometers of toll road, three long-span bridges, two helipads, two toll gates, and a seven-kilometer pile slab. When complete, the project will reduce travel time from two hours to 30 minutes. However, WIKA had to ensure that the roadway could withstand landslides while avoiding 10 transmission towers. To overcome these challenges, as well as orchestrate 33 work packages simultaneously, WIKA needed digital twin workflows.WIKA used iTwin Capture Modeler to process 500 hectares of aerial survey data, then used OpenRoads to design the roadway and OpenBridge to manage the massive amount of structural data. By using iTwin Capture, the team increased the speed, accuracy, and consistency of processed data by 100%. Bentley’s civil applications helped iterate design alternatives by 35% and increased the safety factor by 0.231, fulfilling the safety requirement. Not only did they save 667,708 working hours, they also reduced their carbon emissions by 51,000 tons.

20% Off Bentley Software

Deal Ends Friday

Use Coupon Code "THANKS24"

庆祝卓越的基础设施交付和性能

The 2024 Year in Infrastructure and Going Digital Awards

Nominate a project for the most prestigious awards in infrastructure! Extended deadline to enter is April 29th.