主页 / 项目 / 能源输送和通信网络 / 湖北能源集团随县和广水 80 MWp 地面光伏发电工程

获奖者

Organization and Company name

湖北省电力勘测设计院有限公司

湖北能源集团随县和广水 80 MWp 地面光伏发电工程

图片来源:湖北省电力勘测设计院有限公司

获奖者

Organization and Company name

湖北省电力勘测设计院有限公司

湖北能源集团随县和广水 80 MWp 地面光伏发电工程

图片来源:湖北省电力勘测设计院有限公司
Award Category

能源输送和通信网络

地点

中国,湖北省,广水市

Bentley software used

iTwin, iTwin.js, MicroStation, OpenUtilities Substation, OpenBuildings, OpenRoads Designer, SYNCHRO 4D

Project summary

When PowerChina Hubei Electric Engineering was hired as the engineering, procurement, and construction contractor to deliver an 80-megawatt ground-based photovoltaic power station, they faced several challenges, including a short 10-month schedule with a requirement to realize lifecycle digital twin application. They originally used third-party design software but quickly realized that it was inefficient and that they needed integrated dynamic modeling technology.PowerChina Hubei selected OpenBuildings Designer and OpenRoads for 3D modeling, as well as ProjectWise for collaborative design management. With Bentley, they developed photovoltaic design software for mountainous photovoltaic power projects. The solution optimized the design scheme, reducing land occupation and avoiding 40 potential rework scenarios to save more than CNY 800,000. Integrating SYNCHRO 4D accelerated construction by approximately 30 days. They used the Bentley iTwin platform to automatically generate digital twin models, avoiding approximately CNY 1 million in costs had the digital twins been developed at the operation stage.

20% Off Bentley Software

Deal Ends Friday

Use Coupon Code "THANKS24"

庆祝卓越的基础设施交付和性能

The 2024 Year in Infrastructure and Going Digital Awards

Nominate a project for the most prestigious awards in infrastructure! Extended deadline to enter is April 29th.