ATTEND AND PARTICIPATE
2026 EVENT PREVIEW
Projects
See all of this year’s entries
Sessions
Preview keynotes & industry talks
Speakers
Meet the experts & innovators
PAST PROJECTS
Awards & recognition
2025 winners
First-place award recipients
2026 finalists
Shortlisted top contenders
2025 Founders’ Honors
Projects that inspire us
ATTEND AND PARTICIPATE
2026 EVENT PREVIEW
Projects
See all of this year’s entries
Sessions
Preview keynotes & industry talks
Speakers
Meet the experts & innovators
PAST PROJECTS
Awards & recognition
2025 winners
First-place award recipients
2026 finalists
Shortlisted top contenders
2025 Founders’ Honors
Projects that inspire us
About YII
Experience YII
Past Projects
Back
INSIDE the awards
About
Event yearbooks
Event news and updates
Bentley Labs
LATEST NEWS
2025 winners
2024 Yearbook
Back
attend and participate
Back
past projects
Awards & recognition
2025 winners
2026 finalists
2025 Founders’ Honors
LATEST NEWS
Blog article highlight
2026 categories
2024 Yearbook
AWARD CATEGORY
iTwin Capture, LumenRT, OpenBridge, OpenRoads, ProStructures
Liaozi Grand Bridge is the final link along the Chongqing Chengkou-Kaizhou Expressway that will connect the Qinba region to the rest of the county, reducing travel times by one-third and promoting industrial and economic development that will revitalize the rural mountainous area. The large-span arch bridge has a main deck length of 252 meters, with its highest point 186 meters above the river surface. The multiple bridge components and steep terrain presented design and construction challenges requiring comprehensive application of BIM-based digital workflows.The project team selected Bentley’s integrated reality modeling and BIM applications to generate a reality mesh of the existing site from drone-captured images, as well as a 3D bridge model. Using Bentley applications, they developed a digital modeling and construction management platform, reducing design time by 300 hours and shortening the construction period by 55 days to save CNY 2.2 million in management costs. Through 3D digitization and visualization, the team reduced the environmental footprint of the project and have laid the foundation for developing a digital twin for digital bridge maintenance and operations.