ATTEND AND PARTICIPATE
2026 EVENT PREVIEW
Projects
See all of this year’s entries
Sessions
Preview keynotes & industry talks
Speakers
Meet the experts & innovators
PAST PROJECTS
Awards & recognition
2025 winners
First-place award recipients
2026 finalists
Shortlisted top contenders
2025 Founders’ Honors
Projects that inspire us
ATTEND AND PARTICIPATE
2026 EVENT PREVIEW
Projects
See all of this year’s entries
Sessions
Preview keynotes & industry talks
Speakers
Meet the experts & innovators
PAST PROJECTS
Awards & recognition
2025 winners
First-place award recipients
2026 finalists
Shortlisted top contenders
2025 Founders’ Honors
Projects that inspire us
About YII
Experience YII
Past Projects
Back
INSIDE the awards
About
Event yearbooks
Event news and updates
Bentley Labs
LATEST NEWS
2025 winners
2024 Yearbook
Back
attend and participate
Back
past projects
Awards & recognition
2025 winners
2026 finalists
2025 Founders’ Honors
LATEST NEWS
Blog article highlight
2026 categories
2024 Yearbook
AWARD CATEGORY
ProjectWise, STAAD
The broad-gauge 125-kilometer railway link between Rishikeh and Karnaprayag is Uttarakhand’s first major railway infrastructure development to facilitate better mobility and connectivity. Louis Berger was awarded the design and project management contract for the bridges along a 14.263-kilometer span, including a record 125-meter bridge span crossing the River Ganges in a highly seismic zone near faults in the Himalayan region. They faced engineering and coordination challenges among the dispersed, interdisciplinary team to ensure the structural integrity and safety of the long-span bridge.
They selected ProjectWise to establish a connected data environment, streamlining communication and reducing errors to minimize risks and project costs. Using STAAD.Pro for structural modeling and analysis reduced the time needed to arrive at the optimal structural solution, resulting in reduced loads on the foundation, which also minimized environmental impact and reduced material costs. Bentley’s integrated digital applications enabled them to complete the project within the budget and timeline while saving significant resource hours.