ATTEND AND PARTICIPATE
2026 EVENT PREVIEW
Projects
See all of this year’s entries
Sessions
Preview keynotes & industry talks
Speakers
Meet the experts & innovators
PAST PROJECTS
Awards & recognition
2025 winners
First-place award recipients
2026 finalists
Shortlisted top contenders
2025 Founders’ Honors
Projects that inspire us
ATTEND AND PARTICIPATE
2026 EVENT PREVIEW
Projects
See all of this year’s entries
Sessions
Preview keynotes & industry talks
Speakers
Meet the experts & innovators
PAST PROJECTS
Awards & recognition
2025 winners
First-place award recipients
2026 finalists
Shortlisted top contenders
2025 Founders’ Honors
Projects that inspire us
About YII
Experience YII
Past Projects
Back
INSIDE the awards
About
Event yearbooks
Event news and updates
Bentley Labs
LATEST NEWS
2025 winners
2024 Yearbook
Back
attend and participate
Back
past projects
Awards & recognition
2025 winners
2026 finalists
2025 Founders’ Honors
LATEST NEWS
Blog article highlight
2026 categories
2024 Yearbook
AWARD CATEGORY
Bentley Descartes, Bentley LumenRT, iTwin Capture, MicroStation, OpenPlant, PLAXIS, ProjectWise, STAAD, SYNCHRO
The Caiziba pumped-storage power station is the first large-scale pumped storage project in China’s complex karst area. Located amid extensive karst formations, including caves and fissures, the project presented significant site challenges, compounded by technical and coordination issues. Previous traditional design and modeling applications resulted in data fragmentation and workflow bottlenecks. To address these shortcomings, the project team realized that they needed an integrated, dynamic technology solution.
Leveraging Bentley’s 3D modeling, digital twin, and construction simulation technology, the team established a collaborative digital platform and standardized component library, streamlining workflows and achieving dynamic coupling of geological modeling and construction. Working in a coordinated design environment eliminated 1,850 conflicts to avoid rework costs of approximately CNY 4.5 million. The integrated digital twin solution shortened the construction period by 42 days and optimized steel and concrete usage, reducing carbon emissions by 11,110 tons to deliver intelligent green infrastructure that supports regional clean energy transformation.