ATTEND AND PARTICIPATE
2026 EVENT PREVIEW
Projects
See all of this year’s entries
Sessions
Preview keynotes & industry talks
Speakers
Meet the experts & innovators
PAST PROJECTS
Awards & recognition
2025 winners
First-place award recipients
2026 finalists
Shortlisted top contenders
2025 Founders’ Honors
Projects that inspire us
ATTEND AND PARTICIPATE
2026 EVENT PREVIEW
Projects
See all of this year’s entries
Sessions
Preview keynotes & industry talks
Speakers
Meet the experts & innovators
PAST PROJECTS
Awards & recognition
2025 winners
First-place award recipients
2026 finalists
Shortlisted top contenders
2025 Founders’ Honors
Projects that inspire us
About YII
Experience YII
Past Projects
Back
INSIDE the awards
About
Event yearbooks
Event news and updates
Bentley Labs
LATEST NEWS
2025 winners
2024 Yearbook
Back
attend and participate
Back
past projects
Awards & recognition
2025 winners
2026 finalists
2025 Founders’ Honors
LATEST NEWS
Blog article highlight
2026 categories
2024 Yearbook
AWARD CATEGORY
Bentley Descartes, Bentley LumenRT, MicroStation, OpenBridge, OpenRoads, ProjectWise, ProStructures, Other (Infrastructure Cloud, ProjectWise 365)
Connecting Northeast Iowa and Southwest Wisconsin, the nearly 100-year-old Black Hawk Bridge in Lansing is being reconstructed to adequately accommodate 21st century traffic flow. Maintaining its aesthetic structural steel truss while modernizing the bridge capacity and safety, the new 1,724-foot structure represents the only Mississippi River crossing within 30 miles. Foth is delivering the project as the first comprehensive digital bridge design for the State of Iowa. To meet their digital deliverables, they needed a comprehensive, integrated technology solution.
Leveraging Bentley Open applications and the Bentley iTwin platform, Foth established a 3D model and single source of truth that could be used from initial conceptual design throughout construction and lifecycle management. Working in a connected, cloud-based environment with the digital model streamlined design, estimated to reduce the project schedule by 1.5 months and save USD 3.2 million in total costs. The model will facilitate future maintenance, team safety, and overall sustainability.