Umfassende Anwendung von BIM-basiertem digitalem und intelligentem Entwurf und Bau für die große Brücke von Liaozi

Bildnachweis: China Railway Changjiang Transportation Design Group Co., Ltd. Road & Bridge International Co., Ltd. Chongqing Expressway Group Co., Ltd.

Project

Name der Organisation und des Unternehmens

China Railway Changjiang Transportation Design Group Co., Ltd. Road & Bridge International Co., Ltd. Chongqing Expressway Group Co., Ltd.

Umfassende Anwendung von BIM-basiertem digitalem und intelligentem Entwurf und Bau für die große Brücke von Liaozi

Bildnachweis: China Railway Changjiang Transportation Design Group Co., Ltd. Road & Bridge International Co., Ltd. Chongqing Expressway Group Co., Ltd.
Auszeichnungskategorie

Brücken und Tunnel

Standort

Chongqing, Chongqing, China

Eingesetzte Bentley-Software

iTwin Capture, LumenRT, OpenBridge, OpenRoads, ProStructures

Projektübersicht

Liaozi Grand Bridge is the final link along the Chongqing Chengkou-Kaizhou Expressway that will connect the Qinba region to the rest of the county, reducing travel times by one-third and promoting industrial and economic development that will revitalize the rural mountainous area. The large-span arch bridge has a main deck length of 252 meters, with its highest point 186 meters above the river surface. The multiple bridge components and steep terrain presented design and construction challenges requiring comprehensive application of BIM-based digital workflows.The project team selected Bentley’s integrated reality modeling and BIM applications to generate a reality mesh of the existing site from drone-captured images, as well as a 3D bridge model. Using Bentley applications, they developed a digital modeling and construction management platform, reducing design time by 300 hours and shortening the construction period by 55 days to save CNY 2.2 million in management costs. Through 3D digitization and visualization, the team reduced the environmental footprint of the project and have laid the foundation for developing a digital twin for digital bridge maintenance and operations.

20 % Rabatt auf Bentley-Software

Angebot endet am Freitag

Verwenden Sie den Gutscheincode „THANKS24“

Feiern Sie mit uns die Umsetzung von Infrastruktur und herausragende Leistungen

Year in Infrastructure und Going Digital Awards 2024

Reichen Sie ein Projekt ein für die renommiertesten Auszeichnungen im Infrastrukturbereich! Die verlängerte Einreichungsfrist endet am 29. April.