Startseite / Projekte / Wasser und Abwasser / Entwicklung und Verwaltung von Versorgungseinrichtungen für Nadaprabhu Kempegowda Layout (NPKL)

Project

Name der Organisation und des Unternehmens

L&T CONSTRUCTION

Entwicklung und Verwaltung von Versorgungseinrichtungen für Nadaprabhu Kempegowda Layout (NPKL)

Bildnachweis: L&T CONSTRUCTION

Project

Name der Organisation und des Unternehmens

L&T CONSTRUCTION

Entwicklung und Verwaltung von Versorgungseinrichtungen für Nadaprabhu Kempegowda Layout (NPKL)

Bildnachweis: L&T CONSTRUCTION
Auszeichnungskategorie

Wasser und Abwasser

Standort

Bangalore, Karnataka, Indien

Eingesetzte Bentley-Software

OpenFlows, STAAD

Projektübersicht

As part of creating a dynamic and sustainable NPKL township, Bangalore Development Authority initiated an integrated area development project which included the scope of potable water supply, sewerage collection, and recycle water network through a piped system for 3,032 homes. L&T Construction is responsible for design, construction, commissioning, and operations and maintenance for 10 years. Faced with a constrained construction area and multiple disciplines working amid a tight schedule, L&T realized that conventional methods were time-consuming, delivered inaccurate results and were prone to rework in design and execution stages since the scope involves extensive house service connections and laying of multiple utilities in the same constrained area. Therefore, they needed an integrated hydraulic and structural modeling solution.Leveraging OpenFlows and STAAD, L&T modeled and analyzed multiple hydraulic operating scenarios in order to ensure that the sewer and water network is optimised and performed structural design & analysis for 125 different structures. Bentley’s integrated technology solution saved 40% in engineering resource hours, and assisted in completing the engineering works in six months compared to nine months using manual processes. Establishing collaborative digital workflows avoided clashes and minimized rework, improving productivity by 25%. Implementing digital monitoring systems will enable remote operations and maintenance functions for smart utility management.

20 % Rabatt auf Bentley-Software

Angebot endet am Freitag

Verwenden Sie den Gutscheincode „THANKS24“

Feiern Sie mit uns die Umsetzung von Infrastruktur und herausragende Leistungen

Year in Infrastructure und Going Digital Awards 2024

Reichen Sie ein Projekt ein für die renommiertesten Auszeichnungen im Infrastrukturbereich! Die verlängerte Einreichungsfrist endet am 29. April.