ホーム / プロジェクト / Surveying and monitoring / New Bullards Bar Dam

Project

組織名・会社名

Yuba Water Agency

New Bullards Bar Dam

Image Credit: Yuba Water Agency

Project

組織名・会社名

Yuba Water Agency

New Bullards Bar Dam

Image Credit: Yuba Water Agency
受賞カテゴリ

Surveying and monitoring

場所

Camptonville, California, United States

使用されるBentleyソフトウェア

iTwin, iTwin Capture, iTwin IoT

プロジェクト概要

Constructed in 1970, New Bullards Bar Dam was part of the Yuba River Development project to reduce flood risk, generate clean hydropower, and ensure reliable water supply for Yuba County. Yuba Water Agency initiated a modernization of the dam monitoring system, replacing a hazardous legacy system and manual inspections. The new system optimizes dam operations, preventing potential loss of life and billions of dollars of damage in Northern Sacramento Valley. Faced with steep terrain and site challenges, Yuba Water needed to remotely survey and monitor the dam.They selected iTwin Capture Modeler to generate a 3D reality mesh from thousands of drone-captured images and uploaded the mesh to the iTwin Platform, creating a digital twin. The digital twin remotely captures sensor data from monitoring devices and performs real-time digital crack detection, enabling visualization into the structural integrity of the dam. Compared to the conventional monitoring system, the automated digital station provides 1,000 times more data monitoring points and has improved data accuracy by 50% and risk assessment by 100%.

Bentleyソフトウェアが20%オフ

セールは金曜日まで

クーポンコード「THANKS24」を使用

インフラストラクチャの提供とパフォーマンスの卓越性を称える

2024 Year in Infrastructure & Going Digital Awards

インフラ分野で最も権威のある賞にプロジェクトをノミネートしましょう! 応募期限は4月29日です。