Accueil / Projets / Surveying and monitoring / Nouveau barrage Bullards Bar

Project

Nom de l'organisation et de l'entreprise

Yuba Water Agency

Nouveau barrage Bullards Bar

Image Credit: Yuba Water Agency

Project

Nom de l'organisation et de l'entreprise

Yuba Water Agency

Nouveau barrage Bullards Bar

Image Credit: Yuba Water Agency
Catégorie de prix

Surveying and monitoring

Lieu

Camptonville, Californie, États-Unis

Logiciel Bentley utilisé

iTwin, iTwin Capture, iTwin IoT

Résumé du projet

Constructed in 1970, New Bullards Bar Dam was part of the Yuba River Development project to reduce flood risk, generate clean hydropower, and ensure reliable water supply for Yuba County. Yuba Water Agency initiated a modernization of the dam monitoring system, replacing a hazardous legacy system and manual inspections. The new system optimizes dam operations, preventing potential loss of life and billions of dollars of damage in Northern Sacramento Valley. Faced with steep terrain and site challenges, Yuba Water needed to remotely survey and monitor the dam.They selected iTwin Capture Modeler to generate a 3D reality mesh from thousands of drone-captured images and uploaded the mesh to the iTwin Platform, creating a digital twin. The digital twin remotely captures sensor data from monitoring devices and performs real-time digital crack detection, enabling visualization into the structural integrity of the dam. Compared to the conventional monitoring system, the automated digital station provides 1,000 times more data monitoring points and has improved data accuracy by 50% and risk assessment by 100%.

20 % de réduction sur les logiciels Bentley

L'OFFRE PREND FIN VENDREDI

Utilisez le code « THANKS24 »

Célébrez l'excellence en matière d'infrastructure et de performance

Year in Infrastructure 2024 et Going Digital Awards

Présentez un projet pour les prix les plus prestigieux en matière d'infrastructure ! La nouvelle date limite d'inscription est le 29 avril.