获奖者
中国电建集团中南勘测设计研究院有限公司
Shandong Energy Group Bozhong Offshore Wind Farm Site A Project
获奖者
中国电建集团中南勘测设计研究院有限公司
Shandong Energy Group Bozhong Offshore Wind Farm Site A Project
Process and power generation
中国,山东省,东营市
Bentley software used
Bentley Raceway and Cable Management、MicroStation、OpenBuildings、OpenPlant、OpenRoads、OpenWindPower、PLAXIS、ProjectWise、ProStructures
Project summary
The Bozhong Offshore Wind Farm is the first grid-parity offshore wind farm project in Shandong, pioneering the intersection of submarine cables and oil and gas pipelines. Upon completion, the facility will provide 1.698 billion kilowatt-hours of clean electricity to the grid annually, reducing carbon emissions by 1.26 million tons. The project presented complex hydrological and geological site conditions, required cost-efficient design solutions, and involved coordinating multiple stakeholders on a tight timeline. To address these issues, the team needed an integrated technology solution.Leveraging Bentley’s open 3D modeling software with ProjectWise, they established a collaborative digital environment, BIM models, and a digital twin to realize automated design and intelligent workflows and delivery. The integrated technology approach reduced modeling time by 30%, shortened the construction period by 20%, and saved 10% in costs. Using Bentley’s applications, the team developed a full lifecycle digital twin, achieving digital and intelligent construction control, facility operations, and maintenance.