主页 / 项目 / Process and power generation / 获奖者 / Shandong Energy Group Bozhong Offshore Wind Farm Site A Project

获奖者

Organization and Company name

中国电建集团中南勘测设计研究院有限公司

Shandong Energy Group Bozhong Offshore Wind Farm Site A Project

图片来源:中国电建集团中南勘测设计研究院有限公司

获奖者

Organization and Company name

中国电建集团中南勘测设计研究院有限公司

Shandong Energy Group Bozhong Offshore Wind Farm Site A Project

图片来源:中国电建集团中南勘测设计研究院有限公司
Award Category

Process and power generation

地点

中国,山东省,东营市

Bentley software used

Bentley Raceway and Cable Management, MicroStation, OpenBuildings, OpenPlant, OpenRoads, OpenWindPower, PLAXIS, ProjectWise, ProStructures

Project summary

The Bozhong Offshore Wind Farm is the first grid-parity offshore wind farm project in Shandong, pioneering the intersection of submarine cables and oil and gas pipelines. Upon completion, the facility will provide 1.698 billion kilowatt-hours of clean electricity to the grid annually, reducing carbon emissions by 1.26 million tons. The project presented complex hydrological and geological site conditions, required cost-efficient design solutions, and involved coordinating multiple stakeholders on a tight timeline. To address these issues, the team needed an integrated technology solution.Leveraging Bentley’s open 3D modeling software with ProjectWise, they established a collaborative digital environment, BIM models, and a digital twin to realize automated design and intelligent workflows and delivery. The integrated technology approach reduced modeling time by 30%, shortened the construction period by 20%, and saved 10% in costs. Using Bentley’s applications, the team developed a full lifecycle digital twin, achieving digital and intelligent construction control, facility operations, and maintenance.

20% Off Bentley Software

Deal Ends Friday

Use Coupon Code "THANKS24"

庆祝卓越的基础设施交付和性能

The 2024 Year in Infrastructure and Going Digital Awards

Nominate a project for the most prestigious awards in infrastructure! Extended deadline to enter is April 29th.