주강 삼각주 초심도 송수 터널에 대한 BIM 기술 응용
Project
CHINA RAILWAY 18TH BUREAU GROUP CO., LTD.
주강 삼각주 초심도 송수 터널에 대한 BIM 기술 응용
시공
중국 광둥성 포산
사용된 Bentley 소프트웨어
ContextCapture, LumenRT, MicroStation, OpenBuildings, OpenRoads, PLAXIS, SYNCHRO
프로젝트 개요
The Pearl River Delta Water Resources Allocation project is the largest water conservancy investment ever made in Guangdong province. It will improve water supply security and capacity, as well as promote sustainable development in the region. China Railway 18th Bureau Group is responsible for the construction and execution of the ultra-deep, double-track water transmission tunnel, located 70 meters underground along a 113.2-kilometer transmission line. The project’s complex topography and geology presented numerous technical difficulties, coordination challenges, and safety risks, requiring the team to leverage an integrated BIM and GIS technology solution.China Railway selected Bentley’s BIM, reality modeling, and geotechnical analysis applications, along with SYNCHRO, to establish a connected data environment, create a full lifecycle digital management platform, and improve collaboration efficiencies by nearly 50%. Through digital workflows and construction simulations, they optimized construction planning and organization, reducing the construction period by 62 days and saving CNY 8.7 million. The integrated digital solution provides a foundation for similar projects and promotes smart water conservancy country wide.