ATTEND AND PARTICIPATE
2026 EVENT PREVIEW
Projects
See all of this year’s entries
Sessions
Preview keynotes & industry talks
Speakers
Meet the experts & innovators
PAST PROJECTS
Awards & recognition
2025 winners
First-place award recipients
2026 finalists
Shortlisted top contenders
2025 Founders’ Honors
Projects that inspire us
ATTEND AND PARTICIPATE
2026 EVENT PREVIEW
Projects
See all of this year’s entries
Sessions
Preview keynotes & industry talks
Speakers
Meet the experts & innovators
PAST PROJECTS
Awards & recognition
2025 winners
First-place award recipients
2026 finalists
Shortlisted top contenders
2025 Founders’ Honors
Projects that inspire us
About YII
Experience YII
Past Projects
Back
INSIDE the awards
About
Event yearbooks
Event news and updates
Bentley Labs
LATEST NEWS
2025 winners
2024 Yearbook
Back
attend and participate
Back
past projects
Awards & recognition
2025 winners
2026 finalists
2025 Founders’ Honors
LATEST NEWS
Blog article highlight
2026 categories
2024 Yearbook
AWARD CATEGORY
GeoStudio, Leapfrog Works, OpenGround, PLAXIS, ProjectWise
The Springbank Off-stream Reservoir is a flood-mitigation system designed to protect Calgary and downstream communities from Elbow River flooding. Stantec Consulting Ltd. led the engineering work and had to safely deliver a 29-meter dam and 4.7-kilometer diversion channel while managing weak glaciolacustrine clay foundations, variable borrow soils, and high groundwater under a schedule tied to flood readiness before the 2025 season.
Using Bentley applications, Stantec kept subsurface data current, updated geological models during construction, and validated staged decisions with field instrumentation. GeoStudio 3D analysis reduced aggregate needs to 25% of the conventional 2D solution and saved about CAD 1.5 million, while accurate characterization enabled the reuse of 6 million cubic meters of excavated material. The resulting reservoir now helps protect more than 1.6 million residents and supports a 70% reduction in Calgary’s flood risk exposure.