ATTEND AND PARTICIPATE
2026 EVENT PREVIEW
Projects
See all of this year’s entries
Sessions
Preview keynotes & industry talks
Speakers
Meet the experts & innovators
PAST PROJECTS
Awards & recognition
2025 winners
First-place award recipients
2026 finalists
Shortlisted top contenders
2025 Founders’ Honors
Projects that inspire us
ATTEND AND PARTICIPATE
2026 EVENT PREVIEW
Projects
See all of this year’s entries
Sessions
Preview keynotes & industry talks
Speakers
Meet the experts & innovators
PAST PROJECTS
Awards & recognition
2025 winners
First-place award recipients
2026 finalists
Shortlisted top contenders
2025 Founders’ Honors
Projects that inspire us
About YII
Experience YII
Past Projects
Back
INSIDE the awards
About
Event yearbooks
Event news and updates
Bentley Labs
LATEST NEWS
2025 winners
2024 Yearbook
Back
attend and participate
Back
past projects
Awards & recognition
2025 winners
2026 finalists
2025 Founders’ Honors
LATEST NEWS
Blog article highlight
2026 categories
2024 Yearbook
AWARD CATEGORY
ContextCapture, LumenRT, MicroStation, OpenBuildings, OpenRoads, PLAXIS, SYNCHRO
The Pearl River Delta Water Resources Allocation project is the largest water conservancy investment ever made in Guangdong province. It will improve water supply security and capacity, as well as promote sustainable development in the region. China Railway 18th Bureau Group is responsible for the construction and execution of the ultra-deep, double-track water transmission tunnel, located 70 meters underground along a 113.2-kilometer transmission line. The project’s complex topography and geology presented numerous technical difficulties, coordination challenges, and safety risks, requiring the team to leverage an integrated BIM and GIS technology solution.China Railway selected Bentley’s BIM, reality modeling, and geotechnical analysis applications, along with SYNCHRO, to establish a connected data environment, create a full lifecycle digital management platform, and improve collaboration efficiencies by nearly 50%. Through digital workflows and construction simulations, they optimized construction planning and organization, reducing the construction period by 62 days and saving CNY 8.7 million. The integrated digital solution provides a foundation for similar projects and promotes smart water conservancy country wide.