Finalist

L&T Construction

AWARD CATEGORY

Structural engineering

Project title

Construction Of 318 MLD (70 MGD) Wastewater Treatment Plant At Coronation Pillar, Delhi 

Location

New Delhi, India

Bentley software used

STAAD

Project summary

Coronation Pillar is a new wastewater treatment plant in New Delhi, treating 318 million liters a day of sewage while reducing annual carbon emissions by approximately 14,450 tons. L&T Construction delivered the large-scale project that required multiple structures to be designed and constructed within a confined site amid liquefaction and seismic risks. Realizing that manual design and analysis methods would be ineffective to ensure optimal structural results, L&T needed dynamic 3D modeling and structural analysis technology.They selected STAAD to model multiple designs with various loading configurations and applications, achieving a land savings of 17.8% and reinforced cement concrete material savings of 5%, reducing both the project’s physical and carbon footprints. Using Bentley’s application, L&T Construction quickly analyzed different structural designs, reducing the time to arrive at an optimal solution by 75%, compared to manual design approaches. The digital structural approach applied during this project serves as a benchmark, resulting in significant added value across other L&T Construction projects.

Image Credit: L&T Construction