ATTEND AND PARTICIPATE
2026 EVENT PREVIEW
Projects
See all of this year’s entries
Sessions
Preview keynotes & industry talks
Speakers
Meet the experts & innovators
PAST PROJECTS
Awards & recognition
2025 winners
First-place award recipients
2026 finalists
Shortlisted top contenders
2025 Founders’ Honors
Projects that inspire us
ATTEND AND PARTICIPATE
2026 EVENT PREVIEW
Projects
See all of this year’s entries
Sessions
Preview keynotes & industry talks
Speakers
Meet the experts & innovators
PAST PROJECTS
Awards & recognition
2025 winners
First-place award recipients
2026 finalists
Shortlisted top contenders
2025 Founders’ Honors
Projects that inspire us
About YII
Experience YII
Past Projects
Back
INSIDE the awards
About
Event yearbooks
Event news and updates
Bentley Labs
LATEST NEWS
2025 winners
2024 Yearbook
Back
attend and participate
Back
past projects
Awards & recognition
2025 winners
2026 finalists
2025 Founders’ Honors
LATEST NEWS
Blog article highlight
2026 categories
2024 Yearbook
AWARD CATEGORY
PLAXIS, STAAD
The Delhi Metro Phase 4 extension will add nearly 62 kilometers to the existing 390-kilometer Delhi Metro, which has revolutionized mass transportation in India, providing reliable, eco-friendly services while also minimizing roadway accidents and vehicular carbon emissions. The Krishna Park project is part of this extension and includes structural design and construction of twin bore tunnels and an underground station. Located in a densely populated urban area with alluvial soil conditions, the project presented structural and geotechnical engineering challenges, requiring an integrated BIM solution.Leveraging PLAXIS and STAAD, the project team modeled and analyzed the soil, and building and tunnel structures, monitoring and simulating structural loads and excavation works. Bentley’s integrated BIM applications streamlined workflows, facilitating clash detection and enabling real-time model modifications prior to work on site, saving 1,000 resource hours and associated costs. Through collaborative digital modeling and analysis, the team optimized structural design, reducing concrete material quantities by approximately 1,500 cubic meters and steel reinforcements by 250 megatons.