ATTEND AND PARTICIPATE
2026 EVENT PREVIEW
Projects
See all of this year’s entries
Sessions
Preview keynotes & industry talks
Speakers
Meet the experts & innovators
PAST PROJECTS
Awards & recognition
2025 winners
First-place award recipients
2026 finalists
Shortlisted top contenders
2025 Founders’ Honors
Projects that inspire us
ATTEND AND PARTICIPATE
2026 EVENT PREVIEW
Projects
See all of this year’s entries
Sessions
Preview keynotes & industry talks
Speakers
Meet the experts & innovators
PAST PROJECTS
Awards & recognition
2025 winners
First-place award recipients
2026 finalists
Shortlisted top contenders
2025 Founders’ Honors
Projects that inspire us
About YII
Experience YII
Past Projects
Back
INSIDE the awards
About
Event yearbooks
Event news and updates
Bentley Labs
LATEST NEWS
2025 winners
2024 Yearbook
Back
attend and participate
Back
past projects
Awards & recognition
2025 winners
2026 finalists
2025 Founders’ Honors
LATEST NEWS
Blog article highlight
2026 categories
2024 Yearbook
AWARD CATEGORY
ContextCapture, MicroStation, OpenBridge Modeler, OpenRoads Designer, ProStructures
A key transportation project in Sichuan, Lexi Expressway serves as an important pathway to alleviate poverty and increase ecological tourism, driving local economic development. With a total length of 151.8 kilometers and a connecting line of 40 kilometers, the megaproject features complicated topography and geology, with over 80% of the roadway length consisting of bridges and tunnels. Contractor Sichuan Highway Planning, Survey, Design and Research Institute faced engineering, coordination, and technical challenges that traditional design and construction methods could not accommodate.They selected Bentley’s open modeling applications to establish a connected data environment, integrating and streamlining design and construction processes. The applications improved data integration, standardization, and design accuracy, identifying more than 1,000 errors and shortening the early stages of construction. Using collaborative BIM workflows and digital twins, they expect to reduce project costs by CNY 20 million to CNY 30 million. The digital models can be updated in real time for use during operations and maintenance.