ATTEND AND PARTICIPATE
2026 EVENT PREVIEW
Projects
See all of this year’s entries
Sessions
Preview keynotes & industry talks
Speakers
Meet the experts & innovators
PAST PROJECTS
Awards & recognition
2025 winners
First-place award recipients
2026 finalists
Shortlisted top contenders
2025 Founders’ Honors
Projects that inspire us
ATTEND AND PARTICIPATE
2026 EVENT PREVIEW
Projects
See all of this year’s entries
Sessions
Preview keynotes & industry talks
Speakers
Meet the experts & innovators
PAST PROJECTS
Awards & recognition
2025 winners
First-place award recipients
2026 finalists
Shortlisted top contenders
2025 Founders’ Honors
Projects that inspire us
About YII
Experience YII
Past Projects
Back
INSIDE the awards
About
Event yearbooks
Event news and updates
Bentley Labs
LATEST NEWS
2025 winners
2024 Yearbook
Back
attend and participate
Back
past projects
Awards & recognition
2025 winners
2026 finalists
2025 Founders’ Honors
LATEST NEWS
Blog article highlight
2026 categories
2024 Yearbook
AWARD CATEGORY
LumenRT, MicroStation, OpenBridge Modeler, OpenFlows CivilStorm, OpenRoads Designer
To help facilitate commerce between Delhi and Mumbai, India’s government began developing a 1,350-kilometer, eight-lane expressway between the two cities. The highway will cut travel time from 24 hours to 12 hours. Larsen & Toubro is responsible for designing and building a 23.7-kilometer section between Mumbai and Vadodara. Their initial plan rapidly became complex because they had to build around an unstable ravine and design interchange loops and ramps with toll plazas to connect the existing highways.Larsen & Toubro knew that OpenRoads Designer would help them create a 3D model of the project and determine how to overcome its challenges. The application allowed them to accurately model the undulating land in the ravine, which assisted with cross drainage structure placement. They also used OpenRoads Designer to simplify the interchange layout and resolve any clashes with existing roads and structures, reducing construction design by 1.5 months. The new expressway reduces vehicle operating costs and travel time by 50%.