ATTEND AND PARTICIPATE
2026 EVENT PREVIEW
Projects
See all of this year’s entries
Sessions
Preview keynotes & industry talks
Speakers
Meet the experts & innovators
PAST PROJECTS
Awards & recognition
2025 winners
First-place award recipients
2026 finalists
Shortlisted top contenders
2025 Founders’ Honors
Projects that inspire us
ATTEND AND PARTICIPATE
2026 EVENT PREVIEW
Projects
See all of this year’s entries
Sessions
Preview keynotes & industry talks
Speakers
Meet the experts & innovators
PAST PROJECTS
Awards & recognition
2025 winners
First-place award recipients
2026 finalists
Shortlisted top contenders
2025 Founders’ Honors
Projects that inspire us
About YII
Experience YII
Past Projects
Back
INSIDE the awards
About
Event yearbooks
Event news and updates
Bentley Labs
LATEST NEWS
2025 winners
2024 Yearbook
Back
attend and participate
Back
past projects
Awards & recognition
2025 winners
2026 finalists
2025 Founders’ Honors
LATEST NEWS
Blog article highlight
2026 categories
2024 Yearbook
AWARD CATEGORY
iTwin Capture
This water conservancy initiative will improve flood control capacity and the ecological environment of Changjiang New Town in Wuhan. The project presented complex terrain and strict environmental requirements, compounded by coordinating voluminous data and multiple stakeholders. Having tried several software applications to process and model the terrain data, the project team realized that they lacked the features and interoperability required to meet modeling accuracy and workflow efficiencies. The engineering firm needed a comprehensive data capture and modeling solution that supported collaboration, design, and construction. The team selected iTwin Capture to create a refined 3D terrain model from aerial images and analyze excavation and construction works. Bentley’s application delivered accurate modeling results and facilitated real-time information sharing, streamlining workflows to improve design precision by 30% and shorten the design cycle by 15 days. Through digital simulations, they optimized the construction scheme, reducing earthworks by 10% to minimize carbon emissions, while saving 25 days and CNY 550,000 during the construction period. The collaborative digital solution lays a solid foundation for sustainable development of the project.